Difference between revisions of "Sep 24, 2013 Calorimetry"
From GlueXWiki
(→Tentative Agenda) |
(→Tentative Agenda) |
||
Line 44: | Line 44: | ||
##* Conclude: no damage found due to insertion of the BCAL into the solenoid. | ##* Conclude: no damage found due to insertion of the BCAL into the solenoid. | ||
## Cosmics Analysis [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=2292 | Shaun K.] | ## Cosmics Analysis [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=2292 | Shaun K.] | ||
− | # Reconstruction and Simulation | + | # Reconstruction and Simulation: [[BCAL Reconstruction Meeting 2013-09-17]] |
# TDR update | # TDR update | ||
# Calibration of Calorimeters | # Calibration of Calorimeters |
Revision as of 11:23, 24 September 2013
'Teleconference Time: 11:00 a.m. EST
- ESNET (Number is 8542553) and SeeVogh session (GlueX Calorimetry meeting room)
- Phone connection only upon request.
- +1-866-740-1260 : US+Canada
- +1-303-248-0285 : International
- then enter participant code: 3421244# (remember the "#").
- or www.readytalk.com (and code without the #)
Contents
Participant Direct Lines
- JLab Phone: in CC F326 is 757-269-6460 (usual room)
- JLab Phone in CC L207 is 757-269-7084
- Phone in the Regina Videoconference Suite is 306-585-4204
- Athens Phone: in Christina's office is 011-30-210-727-6947
Items for followup from previous meeting(s)
- Revisit raw data format for Flash-250 MHz following Flash-125 MHz discussion. (all)
- Upload documentation for interlocks and monitoring to Doc Db (Dan)
- Check that latest edits of TDR have been checked into svn (Zisis)
Tentative Agenda
- Announcements
- October Collaboration Meeting
- Action Items
- Monitoring
- FCAL
- BCAL
- Reassembly of modules used in ESB during tests
- The modules (#1's), which were used for testing modules in the ESB were opened and refurbished for use the the actual detector.
- Traces of liquid were found inside the module on the silicon pad used for extracting heat off the electronics board.
- Initial thoughts were that this was condensation, but closer inspection showed the liquid was somewhat oily. It could be anti-freeze from the cooling system.
- Traces of the liquid were taken from the silicon pad and EH&S has sent them out for evaluation. The amount of liquid might not be sufficient for evaluation. No report yet.
- We want to make sure the system is kept under nitrogen flow.
- Moved BCAL into solenoid!
- Photos Downstream View, Upstream View, Closeup Upstream View
- Removed readout assemblies from both sides of six modules (33-37 and 41) for inspection
- All electronics dry. No visible damage
- Assemblies on the rail pads very tight. Need to remove inside plate on some in order to take them off. This should be standard procedure.
- Downstream no visible anomalies.
- Upstream, boundary between module 41 and 40 showed a thicker dark band at interface (about 1-2 fibers instead of 0.5-1), but did not appear to be due to insertion of the module. Seems consistent with Regina archival photo End 2 Image.
- Conclude: no damage found due to insertion of the BCAL into the solenoid.
- Cosmics Analysis | Shaun K.
- Reassembly of modules used in ESB during tests
- Reconstruction and Simulation: BCAL Reconstruction Meeting 2013-09-17
- TDR update
- Calibration of Calorimeters
- Any other business
Minutes
Attendees: