Difference between revisions of "Minutes-10-17-2013"
From GlueXWiki
Line 3: | Line 3: | ||
= Agenda = | = Agenda = | ||
# Installation preparations [http://www.jlab.org/Hall-D/detector/fdc/installation/FDC_installation.pdf] (all) | # Installation preparations [http://www.jlab.org/Hall-D/detector/fdc/installation/FDC_installation.pdf] (all) | ||
+ | #*Recent pictures from the Hall:[http://www.jlab.org/Hall-D/detector/fdc/installation/status_ofOct17_2013_1.JPG],[http://www.jlab.org/Hall-D/detector/fdc/installation/status_ofOct17_2013_2.JPG],[http://www.jlab.org/Hall-D/detector/fdc/installation/status_ofOct17_2013_3.JPG],[http://www.jlab.org/Hall-D/detector/fdc/installation/status_ofOct17_2013_4.JPG],[http://www.jlab.org/Hall-D/detector/fdc/installation/status_ofOct17_2013_5.JPG],[http://www.jlab.org/Hall-D/detector/fdc/installation/status_ofOct17_2013_6.JPG] | ||
# Engineering (Bill) | # Engineering (Bill) | ||
# Electronics (Chris, Nick) | # Electronics (Chris, Nick) |
Revision as of 15:53, 17 October 2013
October 17, 2013 FDC meeting
Agenda
- Installation preparations [1] (all)
- Engineering (Bill)
- Electronics (Chris, Nick)
- Tests in EEL126 FDC E-log (Beni, Lubomir)
- New F1TDC
- Results from the full electronics test
- Other