Difference between revisions of "Nov 5, 2013 Calorimetry"
From GlueXWiki
(→Minutes) |
|||
Line 39: | Line 39: | ||
# Announcements | # Announcements | ||
# Action Items | # Action Items | ||
− | # Monitoring | + | # Monitoring NIM paper |
+ | #* Responding to referee comments | ||
+ | #* Feedback incorporated from authors | ||
+ | #* Uploaded"final" manuscript to DocDB | ||
+ | #* Comments welcome, will return submission at the end of the week | ||
# FCAL | # FCAL | ||
+ | #* John is keeping progress going | ||
+ | #* Trial fit of plexiglass panes last week | ||
+ | #* Getting ready for when power is available (likely next week) | ||
+ | #* Interlock system. Hand-made circuits with perforated boards did not meet Fernando's standards. He will replace them with printed circuit boards to improve safety and ease of maintenance. | ||
# BCAL | # BCAL | ||
# Reconstruction and Simulation | # Reconstruction and Simulation |
Revision as of 14:34, 5 November 2013
Teleconference Time: 11:00 a.m. EST
- ESNET (Number is 8542553) and SeeVogh session (GlueX Calorimetry meeting room)
- Phone connection only upon request.
- +1-866-740-1260 : US+Canada
- +1-303-248-0285 : International
- then enter participant code: 3421244# (remember the "#").
- or www.readytalk.com (and code without the #)
Contents
[hide]Participant Direct Lines
- JLab Phone: in CC F326 is 757-269-6460 (usual room)
- JLab Phone in CC L207 is 757-269-7084
- Phone in the Regina Videoconference Suite is 306-585-4204
- Athens Phone: in Christina's office is 011-30-210-727-6947
Items for followup from previous meeting(s)
- Revisit raw data format for Flash-250 MHz following Flash-125 MHz discussion. (all)
Tentative Agenda
- Announcements
- Action Items
- Monitoring
- FCAL
- BCAL
- Reconstruction and Simulation
- TDR update
- Calibration of Calorimeters
- BCAL Calibration GlueX-doc-2361
- Pi0 and Eta Statistics GlueX-doc-1702
- Any other business
Minutes
Attendees: Elton, Dave, Beni, Yi, Alam (JLab); Will (CMU); Sean (NW); Matt (IU); Zisis, Andrei, Giovanni (UofR).
- Announcements
- Action Items
- Monitoring NIM paper
- Responding to referee comments
- Feedback incorporated from authors
- Uploaded"final" manuscript to DocDB
- Comments welcome, will return submission at the end of the week
- FCAL
- John is keeping progress going
- Trial fit of plexiglass panes last week
- Getting ready for when power is available (likely next week)
- Interlock system. Hand-made circuits with perforated boards did not meet Fernando's standards. He will replace them with printed circuit boards to improve safety and ease of maintenance.
- BCAL
- Reconstruction and Simulation
- TDR update
- Calibration of Calorimeters
- BCAL Calibration GlueX-doc-2361
- Pi0 and Eta Statistics GlueX-doc-1702
- Any other business