Difference between revisions of "Photon Beam"
From GlueXWiki
Line 8: | Line 8: | ||
* [[Broadband Tagger Hodoscope|broadband tagger hodoscope]] | * [[Broadband Tagger Hodoscope|broadband tagger hodoscope]] | ||
* [[Tagger Microscope|tagger microscope]] | * [[Tagger Microscope|tagger microscope]] | ||
− | * [[Pair Spectrometer Hodoscope|pair spectrometer | + | * [[Pair Spectrometer Hodoscope|pair spectrometer]] |
* [[Active Collimator|active collimator]] | * [[Active Collimator|active collimator]] | ||
* [[Total Absorption Counter|total absorption counter]] | * [[Total Absorption Counter|total absorption counter]] |
Revision as of 09:28, 25 February 2014
Design requirements |
Spectrometers |
Instrumentation |
Radiator System |
Photon beam pipe |
Collimation system |
Sweep Magnet 1 |
Shielding and radiation doses |
Sweep magnet 2 |
Beam simulations |
This is the central reporting page for the
GlueX Tagged Photon Beam Working Group
- group meetings
- send email to group list
- browse mailing list archives
- working group members (private)
- detector construction milestones (private)
- photon beam and tagger instrumentation paper (2010)
- Statement of Work for tagger procurement (2010)
- construction contracts and related info (private)
- discussion of e+/e- tertiary beams in Hall D
- Racks location in the Tagger Hall
- Accelerator:
- Accelerator - Hall D Interface Document (draft - 2008)
- Accelerator Songsheets: links to the song sheets for the NE section of the machine including the beam line to Hall D tagger
- engineering drawings
- diamond radiator assessment
- microscope readout cable lengths and routes
- alignment and calibration
- Beam Commissioning Plan