Difference between revisions of "Photon Beam Commissioning Discussion Aug 13, 2014"
From GlueXWiki
(Created page with "__TOC__ == Organization == * Time: 4 pm EST * Connecting: detailed instructions are here ** H.323 ip address: 199.48.152.152 ** web browse...") |
(→Action Items) |
||
Line 17: | Line 17: | ||
* Estimate rates and ranges of parameters needed for the photon beam tuning (Todd for accelerator; Elton, Hovanes, Eugene, Alexandre for Hall D) | * Estimate rates and ranges of parameters needed for the photon beam tuning (Todd for accelerator; Elton, Hovanes, Eugene, Alexandre for Hall D) | ||
** Need rates for profiler, start counter, ps | ** Need rates for profiler, start counter, ps | ||
− | |||
− | |||
− | |||
== Agenda == | == Agenda == |
Revision as of 17:40, 8 August 2014
Organization
- Time: 4 pm EST
- Connecting: detailed instructions are here
- H.323 ip address: 199.48.152.152
- web browser: https://bluejeans.com/536076821
- phone: 408-740-7256 or 888-240-2560
- Conference id: 536076821
References
Action Items
- Send Todd a geometry of tagger area, including the mapped tagger magnet field, for GEANT simulations (Richard). Sasha defined geometry, Richard will add field map
- Sasha needs to update geometry with girder.
- Richard has not had time to add Dan's new field. For now use the old field.
- Estimate rates and ranges of parameters needed for the photon beam tuning (Todd for accelerator; Elton, Hovanes, Eugene, Alexandre for Hall D)
- Need rates for profiler, start counter, ps
Agenda
- Announcements
- Electron Beam Specifications - Need to verify
- Electron Commissioning (Todd/Mike)
- Photon Commissioning Draft (Alexandre)
- Radiation monitors and controls (Pavel)
- Aug 8 Review:
- Other business
Minutes
Attending: