Present: Naomi, David, Beni, Cody, Lubomir | Present: Naomi, David, Beni, Cody, Lubomir | ||
# FADC125 status | # FADC125 status | ||
− | ##Cody has the new timing algorithm working in simulation, now needs to merge this with the current version of | + | ##Cody has the new timing algorithm working in simulation, now needs to merge this with the current version of fa250-like firmware. |
− | ##There have been a few issues in getting used to the | + | ##There have been a few issues in getting used to the fa250 firmware modes and understanding its error conditions. Mode 7 (readout of pedestal, integral & time; no raw samples) is not available at present, it might be enabled in the firmware but not accessible through the present software version. Also Beni has encountered some problems with readout where some modules do not have the data ready at the block ready check, but output it with the data for the next event instead. |
##For the upcoming run in October we would like: | ##For the upcoming run in October we would like: | ||
###readout mode 7 enabled | ###readout mode 7 enabled | ||
Line 38: | Line 38: | ||
###the peak searching to start with the sample following the pedestal region | ###the peak searching to start with the sample following the pedestal region | ||
:::Cody will work on implementing these (in that order) and decide, based on progress by Monday afternoon, which of these modifications will be in the firmware used for the run. | :::Cody will work on implementing these (in that order) and decide, based on progress by Monday afternoon, which of these modifications will be in the firmware used for the run. | ||
− | + | #Readout of integration period, fa125 firmware | |
− | # | + | ##We need to subtract the pedestal from the integration offline (not on the flash) to prevent the occurrence of a smallish signal on top of a falling pedestal causing too large a pedestal to be subtracted and the result being <0 and being interpreted as a large +ve number instead of as a small -ve number. |
Revision as of 14:35, 1 October 2014
Location and Time
Room: CC F326-327
Time: 2:00pm-3:00pm
Remote Connection
(if problems, call phone in conference room: 757-269-6460)
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 589693655.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/589693655.
- To join via phone, use one of the following numbers and the Conference ID: 462136260
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Previous meeting (Sep 16, 2014)
- Status of FADC125 Firmware
- Readout of integration period for pedestal subtraction
Useful Links
- fADC125 Data Format Specification Document
- Data format for 250 modes on fADC125 from Cody, Aug 15 2014
- FA250 modes 2 from Ed and Hai, Feb 18 2014
- FDC_pulse_data_format
- CMU timing algorithm - details updated
- CDC readout needs Garfield calcs
Minutes
Present: Naomi, David, Beni, Cody, Lubomir
- FADC125 status
- Cody has the new timing algorithm working in simulation, now needs to merge this with the current version of fa250-like firmware.
- There have been a few issues in getting used to the fa250 firmware modes and understanding its error conditions. Mode 7 (readout of pedestal, integral & time; no raw samples) is not available at present, it might be enabled in the firmware but not accessible through the present software version. Also Beni has encountered some problems with readout where some modules do not have the data ready at the block ready check, but output it with the data for the next event instead.
- For the upcoming run in October we would like:
- readout mode 7 enabled
- the pedestal region to be increased from 4 to 16 samples
- the peak searching to start with the sample following the pedestal region
- Cody will work on implementing these (in that order) and decide, based on progress by Monday afternoon, which of these modifications will be in the firmware used for the run.
- Readout of integration period, fa125 firmware
- We need to subtract the pedestal from the integration offline (not on the flash) to prevent the occurrence of a smallish signal on top of a falling pedestal causing too large a pedestal to be subtracted and the result being <0 and being interpreted as a large +ve number instead of as a small -ve number.