Difference between revisions of "GlueX Target Design Review, January 24, 2012"
From GlueXWiki
(Created page with "Present: Steve Christo, Jim Fochtman, Mark Ito, Dave Kashy, Tim Whitlatch, Elliott Wolin ==Review Slides== [https://halldweb1.jlab.org/talks/2012-1Q/Hall%20D%20Target%20Design%...") |
m (Text replacement - "/halldweb1.jlab.org/" to "/halldweb.jlab.org/") |
||
(One intermediate revision by the same user not shown) | |||
Line 3: | Line 3: | ||
==Review Slides== | ==Review Slides== | ||
− | [https:// | + | [https://halldweb.jlab.org/talks/2012-1Q/Hall%20D%20Target%20Design%20Status,%20January%2024,%202012.pptx Jim's Presentation] |
==Notes== | ==Notes== | ||
Line 9: | Line 9: | ||
As recorded by Mark: | As recorded by Mark: | ||
− | * | + | * Steve suggests welded hydrogen line connections rather than fittings, fittings developed leaks over time. |
* Concern from Dave: distance of the condenser from the cold head. Jim moved it downstream to reduce volume of hydrogen in feed line. | * Concern from Dave: distance of the condenser from the cold head. Jim moved it downstream to reduce volume of hydrogen in feed line. | ||
* Dave suggests larger surface contact for making the thermal short between hydrogen line and shield. | * Dave suggests larger surface contact for making the thermal short between hydrogen line and shield. |
Latest revision as of 15:16, 31 March 2015
Present: Steve Christo, Jim Fochtman, Mark Ito, Dave Kashy, Tim Whitlatch, Elliott Wolin
Review Slides
Notes
As recorded by Mark:
- Steve suggests welded hydrogen line connections rather than fittings, fittings developed leaks over time.
- Concern from Dave: distance of the condenser from the cold head. Jim moved it downstream to reduce volume of hydrogen in feed line.
- Dave suggests larger surface contact for making the thermal short between hydrogen line and shield.
- Hall B used boil-off helium to pre-cool target gas. We may add pre-cooler from higher temp head.
- Dave suggested connecting the heater directly to the condenser, not the conduction tube.
- Dave recommends high quality temperature and pressure instrumentation, well calibrated. Useful in knowing when the target is full by knowing position in the phase diagram.
- Dave made had some comments on how to optimize the arrangement of the feed and return lines.