Difference between revisions of "November 30, 2015"
From GlueXWiki
(Created page with "* Modifications of config files :: - parameters for CAEN R-C adjustment :: - parameters for fa125 initialization :: - implementation of SYNC events (in progress) :: - configu...") |
|||
Line 3: | Line 3: | ||
:: - parameters for fa125 initialization | :: - parameters for fa125 initialization | ||
:: - implementation of SYNC events (in progress) | :: - implementation of SYNC events (in progress) | ||
− | :: - configuration of TPOL, concurrent | + | :: - configuration of TPOL, concurrent running with ST |
+ | |||
+ | * Other | ||
+ | :: - new TS firmware version (check in progress) | ||
+ | :: - BCAL LED trigger distribution through the TS (done) | ||
+ | |||
+ | |||
Revision as of 10:01, 30 November 2015
- Modifications of config files
- - parameters for CAEN R-C adjustment
- - parameters for fa125 initialization
- - implementation of SYNC events (in progress)
- - configuration of TPOL, concurrent running with ST
- Other
- - new TS firmware version (check in progress)
- - BCAL LED trigger distribution through the TS (done)
- New firmware for F1TDC
- - update v3 firmware to the version v3_127
- CAEN TDC multi-block readout
- Scalers implementation at SYNC event
- - asynchronous pedestals
- L1 trigger commissioning plans for the fall run
- - TAGM calibration (PS trigger)
- - FDC alignment (ST/TOF + FCAL)
- - FCAL/BCAL triggers (Energy sum)
- - Trigger produced by TAGM/TAGH