Difference between revisions of "January 11, 2016"

From GlueXWiki
Jump to: navigation, search
(Created page with "* Modifications of config files :: - parameters for CAEN R-C adjustment :: - parameters for fa125 initialization :: - implementation of SYNC events (in progress) :: - configu...")
 
 
(3 intermediate revisions by the same user not shown)
Line 1: Line 1:
* Modifications of config files
+
* [[Readout errors in data stream]]
:: - parameters for CAEN R-C adjustment
+
:: - parameters for fa125 initialization
+
:: - implementation of SYNC events (in progress)
+
:: - configuration of TRD, concurrent running with ST (in progress)
+
  
* Other
+
* [[L1 Trigger bank in the reconstruction]]
:: - new TS firmware (check in progress)
+
 
:: - BCAL LED trigger distribution through TS  
+
* [[BCAL LED (TS FP) triggers]]
:: - TPOL stand alone self-trigger with CTP
+
 
 +
* [[Trigger info in the Config DB]]
  
  

Latest revision as of 20:30, 10 January 2016


  • L1 trigger commissioning plans for the fall 2015 spring 2016 run
  • PS trigger (TAGM bias voltage calibration, TAGH, PS voltage scans, efficiency studies). Run TRD in parallel, if no problems.
- test/debug trigger (2 - 3 hours).
- production (1 - 2 night shifts)
run conditions depend on the accelerator performance (200 nA electron current, 10^-4 radiator, 10^-3 converter + Be converter, TBD)
  • Trigger for FDC alignment (ST/TOF + FCAL)
  • Trigger for FCAL MIPs calibration (ST & TOF)
- test/debug trigger (3 - 4 hours, CDC/FDC switched off)
- production at low luminosity with the FDC switched on (1 - 2 night shifts for both the FDC alignmnent and FCAL MIP triggers)
  • Debug FCAL/BCAL trigger
- trigger studies (3 - 4 hours)
- take data with the BCAL/FCAL trigger, FCAL/BCAL thresholds will be tuned, chambers can be switched on depending on run conditions (1 - 2 night shifts).
- test trigger performance at high rate. Take data with 'nominal' trigger thresholds.
  • Trigger generated by TAGM/TAGH
- trigger studies (3 - 4 hours)
- combine TAGH/TAGM with other trigger types.
- take data with the total absorption counter, 2x10-5 radiator, a few nA current (TBD) (2 - 3 hours)
  • Special trigger requests from sub-detectors