Difference between revisions of "Run Planning Meeting Notes, March 27-April 2, 2016"

From GlueXWiki
Jump to: navigation, search
(Created page with "==Monday, March 28== # Accelerator Status ## started beam delivery Sunday ## today: Hall B 1-pass extraction work will interrupt beam availability ## Hall A Moller quads need...")
 
Line 1: Line 1:
 +
==Tuesday, March 29==
 +
 +
# Accelerator Status
 +
## Problem with RF 2L07-7 overnight, control module replaced
 +
## today after lunch: spin studies, will have few interruptions of 15 min. each
 +
## beam studies scheduled for Thursday
 +
# Hall-D/GlueX items
 +
## beam issues
 +
##* drifting y-position
 +
##* satelite bump in beam profiler still there, plus new wart on main peak of x
 +
##* active target counting rate low
 +
## [[media:Quadrupolestudy-3-25-2016.pdf|quadrupole commissioning study]]
 +
## FCAL field dependence study data being taken yesterday (Adesh)
 +
## pair spectrometer study while ramping: deferred
 +
## other systems?
 +
# Run Plan
 +
#* 10:00 study photon beam intensity as function of locks, polarization
 +
#* 12:00 trigger studies
 +
#* 16:00 production running
 +
# Offline analysis?
 +
# Administrative Items
 +
## Standard Conditions
 +
## Google Calendar
 +
# AOB?
 +
 
==Monday, March 28==
 
==Monday, March 28==
  

Revision as of 08:30, 29 March 2016

Tuesday, March 29

  1. Accelerator Status
    1. Problem with RF 2L07-7 overnight, control module replaced
    2. today after lunch: spin studies, will have few interruptions of 15 min. each
    3. beam studies scheduled for Thursday
  2. Hall-D/GlueX items
    1. beam issues
      • drifting y-position
      • satelite bump in beam profiler still there, plus new wart on main peak of x
      • active target counting rate low
    2. quadrupole commissioning study
    3. FCAL field dependence study data being taken yesterday (Adesh)
    4. pair spectrometer study while ramping: deferred
    5. other systems?
  3. Run Plan
    • 10:00 study photon beam intensity as function of locks, polarization
    • 12:00 trigger studies
    • 16:00 production running
  4. Offline analysis?
  5. Administrative Items
    1. Standard Conditions
    2. Google Calendar
  6. AOB?

Monday, March 28

  1. Accelerator Status
    1. started beam delivery Sunday
    2. today: Hall B 1-pass extraction work will interrupt beam availability
    3. Hall A Moller quads need work, target filling, some viewer broken
    4. Hall D can ask for beam (beam on now), but may be taken away for extraction work
  2. Hall-D/GlueX items
    1. beam issues
      • drifting y-position
      • left should in y in tagger harp scan
      • satelite bump in beam profiler still there, plus new wart on main peak of x
      • active target counting rate low
    2. magnet ramping now...done by 2 pm
    3. Lubomir proposal, executed overnight last night
    4. quadrupole commissioning study
    5. FCAL field dependence study data being taken now (Adesh)
    6. pair spectrometer study while ramping?
    7. other systems?
  3. Run Plan
  4. Offline analysis?
  5. Next meeting?
  6. AOB?