Difference between revisions of "Π polarizability Meeting Nov 9, 2016"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 45: | Line 45: | ||
# Announcements | # Announcements | ||
# Notes from meeting with Bryce and Tim | # Notes from meeting with Bryce and Tim | ||
− | # Assumptions for design | + | ## Assumptions for design |
− | #* Assume 8 MWPC detectors (4-X and 4-Y) | + | ##* Assume 8 MWPC detectors (4-X and 4-Y) |
− | #* Use 20 cm thick iron plates between each plane, for a total of 140 cm (seven plates) | + | ##* Use 20 cm thick iron plates between each plane, for a total of 140 cm (seven plates) |
− | #* Use 3" space between iron plates to accommodate the MWPCs (one 1" for the chamber and 1" space on either side) | + | ##* Use 3" space between iron plates to accommodate the MWPCs (one 1" for the chamber and 1" space on either side) |
− | # Additional design questions | + | ## Additional design questions |
− | #* Need attachment points for the MWPCs both for hanging and also for handling. Hooks on each of the four corners? | + | ##* Need attachment points for the MWPCs both for hanging and also for handling. Hooks on each of the four corners? |
− | #* Installation sequence: We assume that the iron will be installed first. The MWPCs will be inserted after the iron is in place | + | ##* Installation sequence: We assume that the iron will be installed first. The MWPCs will be inserted after the iron is in place |
# [[Media:20161019_trigger.pdf|Trigger]](Rory) | # [[Media:20161019_trigger.pdf|Trigger]](Rory) | ||
# [https://userweb.jlab.org/~ilarin/cpp/cppmctrig.pdf Trigger]](Ilia) | # [https://userweb.jlab.org/~ilarin/cpp/cppmctrig.pdf Trigger]](Ilia) |
Revision as of 08:25, 9 November 2016
Meeting Info.
Meeting Time And Location
10:00 EST (JLab time)
TED 2561A PLEASE NOTE DIFFERENT ROOM!
Connecting
You can connect using BlueJeans Video conferencing (ID: 949 429 419). (Click "Expand" to the right for details -->):
- Make sure you have created a BlueJeans account via your JLab CUE account using this link:
- http://jlab.bluejeans.com (You should only need to do this once)
- Meeting ID: 949 429 419
- (you may need to type this in, depending how you connect)
- If connecting via Web Browser: click this link (no passcode is needed):
- If connecting via iOS or Android App:
- Use your JLab e-mail address to log in and then enter the meeting ID given above to join the meeting
- If connecting via Phone: Dial one of the following numbers and then enter the meeting ID above and hit "#" or "##"
- Dial: 1 888 240 2560 (US or Canada only)
- or, List of International Numbers
- If connecting via Polycom unit:
- Dial 199.48.152.152 or bjn.vc
- Enter meeting ID above
Agenda
- Previous meeting: Oct 26, 2016
- Announcements
- Notes from meeting with Bryce and Tim
- Assumptions for design
- Assume 8 MWPC detectors (4-X and 4-Y)
- Use 20 cm thick iron plates between each plane, for a total of 140 cm (seven plates)
- Use 3" space between iron plates to accommodate the MWPCs (one 1" for the chamber and 1" space on either side)
- Additional design questions
- Need attachment points for the MWPCs both for hanging and also for handling. Hooks on each of the four corners?
- Installation sequence: We assume that the iron will be installed first. The MWPCs will be inserted after the iron is in place
- Assumptions for design
- Trigger(Rory)
- Trigger](Ilia)
- Simulation](Bobby)
- Next meeting
Minutes
TBD