Difference between revisions of "Run Planning Meeting Notes, Feb 23- Mar 1, 2017"
From GlueXWiki
Line 23: | Line 23: | ||
#* In the last 24 hours: | #* In the last 24 hours: | ||
#** Feb 22: ABU TBD hrs (TBD), BANU TBD hrs (TBD) | #** Feb 22: ABU TBD hrs (TBD), BANU TBD hrs (TBD) | ||
− | #** Feb 22: Total triggers collected: | + | #** Feb 22: Total triggers collected: 1400 M |
# Issues | # Issues | ||
#* Active collimator | #* Active collimator |
Revision as of 09:42, 23 February 2017
<- Back to Run Coordination Meetings: Spring 2017 Run
Thursday, February 23
- Accelerator Status over the last 24 hrs
- Beam was mostly
- Stable until midnight
- Downtime incidents of more than 30 minutes:
- DAQ 10:45 for about 40 min. , Sergey helped
- Beam position lock on active collimator steered the beam away: 00:15
- Traced problem to pre-amp problem in inner AC (dead or needs to be reset, power cycled ?)
- Harp scans:
- Beam was re-focused around noon ELOG
- final MCC scans : IHA5C11, IHA5C11B
- Radiator HARP scans: Radiator Harp
- (Sigma_X, Sigma_Y) is (0.85,0.55), (0.65, 0.49), and (0.73, 0.43).
- new Harp scans as part of beam steering problem: MCC, Radiator Harp
- Beam was mostly
- Hall-D/GlueX items
- In the last 24 hours:
- Feb 22: ABU TBD hrs (TBD), BANU TBD hrs (TBD)
- Feb 22: Total triggers collected: 1400 M
- In the last 24 hours:
- Issues
- Active collimator
- DAQ issues:
- difficult restart at 10:45
- Monitoring
- Run Plan
- Repair active collimator.
- Do we need an empty target run ?
- Offline Analysis?
- Any Other Business?