Difference between revisions of "Feb 23, 2017 Calorimeter"
From GlueXWiki
(→Minutes) |
|||
Line 52: | Line 52: | ||
# Run preparations | # Run preparations | ||
## [https://halldweb.jlab.org/hdops/wiki/index.php/Forward_Calorimeter_Shift Fcal Shift Information] (Fcal) | ## [https://halldweb.jlab.org/hdops/wiki/index.php/Forward_Calorimeter_Shift Fcal Shift Information] (Fcal) | ||
+ | ##* This page is out of date. Jon will update it. | ||
+ | ## Bcal environment | ||
+ | ##* https://logbooks.jlab.org/entry/3461258 Log Entry 3461258] Bcal humidity is at about 14%. Need to watch it. Tim and Tom have been alerted. | ||
+ | ## Fcal | ||
+ | ##* Base communication issue. Fixed by cycling power remotely. There are also a few FADC channels that are bad and limited FADC spares. Will probably wait till the end of the run to replace electronics. | ||
+ | ##* Matt: Asked about monitoring data, as failures may show up here. Occupancy plots may catch most of them. Adesh has not looked at it yet. | ||
## [https://logbooks.jlab.org/entry/3461536 Log Entry 3461536] Monitorng (Ahmed) | ## [https://logbooks.jlab.org/entry/3461536 Log Entry 3461536] Monitorng (Ahmed) | ||
+ | ##* We have found that there are quadrant-dependent shifts (396 channels). We will renormalize to eliminate this as a source of shift. | ||
+ | ##* New spring 2017 file has been created for the Log Entry plot. Previously we had been using a file generated for spring 2016. | ||
+ | ##* Elton suggested that we take some pulsing data at a fixed voltage (to avoid systematics due to resetting to a specific value). Ahmed will check how many saturation/underflows exist in the present data samples. | ||
+ | ##* Ahmed will run his script to plot the standard deviation over the first week of running. Also one needs to investigate outliers in the plots that were shown. | ||
+ | ##* | ||
# FCAL update | # FCAL update | ||
# BCAL update | # BCAL update |
Revision as of 16:41, 23 February 2017
Contents
[hide]Video Conferencing Information
Meeting Time: 10:00 a.m.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/907185247.
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 907185247.
- To join via phone, use one of the following numbers and the Conference ID: 907185247.
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- Upon connection all microphones are automatically muted. To unmute your mike on a Polycom or equivalent unit, enter *4. Unmuting on a computer is trivial as there is a microphone button than can be clicked.
- More information on connecting to bluejeans is available.
Participant Direct Lines
- JLab Phone in CC L207 is 757-269-7084 (usual room)
- JLab Phone: in CC F326 is 757-269-6460
- Phone in the Regina Video-conference Suite is 306-585-4204
- Athens Phone: in Christina's office is 011-30-210-727-6947
Action Items
References
Tentative Agenda
- Announcements
- Action Items
- Run preparations
- Fcal Shift Information (Fcal)
- Log Entry 3461536 Monitorng (Ahmed)
- FCAL update
- BCAL update
- Preliminary Energy Resolution plots - George
- Calibrations
- pi0 calibrations
- Bcal timing calibrations
- Reconstruction and Simulation
- Log Entry 3461457 Shower containment (Will)
- NIM articles
- Any other business
Minutes
Attendees: Elton, Zisis, Adesh, Mark (JLab); George, Georgios, Christina (Athens); Will, Curtis (CMU); Ahmed (UofR); Matt (IU)
- Announcements
- Action Items
- Run preparations
- Fcal Shift Information (Fcal)
- This page is out of date. Jon will update it.
- Bcal environment
- https://logbooks.jlab.org/entry/3461258 Log Entry 3461258] Bcal humidity is at about 14%. Need to watch it. Tim and Tom have been alerted.
- Fcal
- Base communication issue. Fixed by cycling power remotely. There are also a few FADC channels that are bad and limited FADC spares. Will probably wait till the end of the run to replace electronics.
- Matt: Asked about monitoring data, as failures may show up here. Occupancy plots may catch most of them. Adesh has not looked at it yet.
- Log Entry 3461536 Monitorng (Ahmed)
- We have found that there are quadrant-dependent shifts (396 channels). We will renormalize to eliminate this as a source of shift.
- New spring 2017 file has been created for the Log Entry plot. Previously we had been using a file generated for spring 2016.
- Elton suggested that we take some pulsing data at a fixed voltage (to avoid systematics due to resetting to a specific value). Ahmed will check how many saturation/underflows exist in the present data samples.
- Ahmed will run his script to plot the standard deviation over the first week of running. Also one needs to investigate outliers in the plots that were shown.
- Fcal Shift Information (Fcal)
- FCAL update
- BCAL update
- Preliminary Energy Resolution plots - George
- Calibrations
- pi0 calibrations
- Bcal timing calibrations
- Reconstruction and Simulation
- Log Entry 3461457 Shower containment (Will)
- NIM articles
- Any other business