Difference between revisions of "Run Planning Meeting Notes, Feb 23- Mar 1, 2017"
From GlueXWiki
(→Friday, February 24) |
(→Friday, February 24) |
||
Line 78: | Line 78: | ||
#** TRD test (Lubomir) | #** TRD test (Lubomir) | ||
#** Tested new tagger microscope settings for high luminosity (Alex) | #** Tested new tagger microscope settings for high luminosity (Alex) | ||
− | # Issues | + | # Issues [[#Foo|test]] |
#* Active Collimator repair | #* Active Collimator repair | ||
#** Rebooting IOC did not help | #** Rebooting IOC did not help | ||
Line 96: | Line 96: | ||
#* Simon [https://logbooks.jlab.org/entry/3462007 Rate estimates, Part I][https://logbooks.jlab.org/entry/3462084 Part II] | #* Simon [https://logbooks.jlab.org/entry/3462007 Rate estimates, Part I][https://logbooks.jlab.org/entry/3462084 Part II] | ||
#* [https://logbooks.jlab.org/entry/3461972 Tagger Magnet behavior, Alexandre] | #* [https://logbooks.jlab.org/entry/3461972 Tagger Magnet behavior, Alexandre] | ||
− | # Any Other Business | + | # <span id="Foo"> Any Other Business </span> |
Revision as of 12:04, 24 February 2017
<- Back to Run Coordination Meetings: Spring 2017 Run
Thursday, February 23
Shift | ABU | BNA | BANU |
---|---|---|---|
Day | 5.11 | 1.07 | 1.82 |
Swing | 6.46 | 0.77 | 0.76 |
Owl | 2.35 | 0.00 | 5.65 |
Total | 13.92 | 1.85 | 8.23 |
- Accelerator Status over the last 24 hrs
- Beam was mostly
- Stable until midnight
- Harp scans:
- Beam was re-focused around noon ELOG
- final MCC scans : IHA5C11, IHA5C11B
- Radiator HARP scans: Radiator Harp
- (Sigma_X, Sigma_Y) is (0.85,0.55), (0.65, 0.49), and (0.73, 0.43).
- new Harp scans as part of beam steering problem: MCC, Radiator Harp
- Beam was mostly
- Hall-D/GlueX items
- Downtime incidents of more than 30 minutes:
- DAQ 10:45 for about 40 min. , Sergey helped
- Beam position lock on active collimator steered the beam away: 00:15
- Traced problem to pre-amp problem in inner AC (dead or needs to be reset, power cycled ?)
- Total triggers collected: 1400 M
- Downtime incidents of more than 30 minutes:
- Issues
- Active collimator
- DAQ issues:
- difficult restart at 10:45pm
- Monitoring
- Run Plan
- Repair active collimator.
- HIgh luminosity ?
- Offline Analysis?
- Any Other Business?
Friday, February 24
Shift | ABU | BNA | BANU |
---|---|---|---|
Day | 3.12 | 1.31 | 3.57 |
Swing | 6.13 | 0.72 | 1.15 |
Owl | 5.76 | 1.96 | 0.28 |
Total | 15.01 | 4.00 | 5.00 |
- Accelerator Status over the last 24 hrs
- Beam was mostly:
- Stable : Beam current and positions
- Harp scans:
- Beam line, Radiator Harp, before AC repair
- (Sigma_X, Sigma_Y) is (0.85,0.55), (0.93, 0.55), and (0.64, 0.46).
- After AC repair: Radiator Harp
- Beam was mostly:
- Hall-D/GlueX items
- In the last 24 hours:
- Feb 23: Total triggers collected: 1580 M
- Current Total: 27.1 B
- Trigger studies (Sasha)
- TRD test (Lubomir)
- Tested new tagger microscope settings for high luminosity (Alex)
- In the last 24 hours:
- Issues test
- Active Collimator repair
- Rebooting IOC did not help
- Alex Barnes and Trent Allison found problem to be low voltage power supply, repair completed 11:55am ELOG.
- DAQ issues:
- Crash, Sergey helped recovering (approx. 45 min)
- Active Collimator repair
- Monitoring
- Low-level monitoring report
- Increase of missing FCAL channels:30770, 30778,30780, 30783
- Run Plan
- Current Plan
- Long mode run ?
- Empty target run ?
- TAC run ?
- High luminosity ?
- Offline Analysis
- Any Other Business