Difference between revisions of "2016-03-16"
From GlueXWiki
(→Announcements) |
m (Text replacement - "http://argus.phys.uregina.ca/gluex" to "https://halldweb.jlab.org") |
||
(8 intermediate revisions by 5 users not shown) | |||
Line 16: | Line 16: | ||
== Agenda == | == Agenda == | ||
=== Announcements === | === Announcements === | ||
+ | * Accelerator Update | ||
* [https://www.jlab.org/conferences/photoproduction16/ Nuclear Photoproduction with GlueX] April 28-29 | * [https://www.jlab.org/conferences/photoproduction16/ Nuclear Photoproduction with GlueX] April 28-29 | ||
* [[GlueX-Collaboration-May-2016|Collaboration Meeting]] May 9-11 | * [[GlueX-Collaboration-May-2016|Collaboration Meeting]] May 9-11 | ||
Line 22: | Line 23: | ||
=== Run Planning for Spring 2016 === | === Run Planning for Spring 2016 === | ||
* [[Run Coordination Meetings: Spring 2016 Run]] | * [[Run Coordination Meetings: Spring 2016 Run]] | ||
+ | *'''Progress report for the last two weeks''': [[File:RC_report_gluex_weekly_march16_2016.pdf|51px|thumb|center| ]] | ||
+ | *[https://halldweb.jlab.org/wiki/index.php/Run_Coordination_Meetings:_Spring_2016_Run#Runplan_time_charts_.28readjusted_after_CHL_repair_started_on_March_9th.29 Time charts for the last 4 weeks, readjusted for the CHL repair] | ||
* [http://www.jlab.org/Hall-D/shifts Shift Schedule] | * [http://www.jlab.org/Hall-D/shifts Shift Schedule] | ||
=== Analysis Activities === | === Analysis Activities === | ||
* Results from the Spring 2016 Run. | * Results from the Spring 2016 Run. | ||
− | ** Photon Polarization (Justin Stevens) | + | ** [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=2975 Photon Polarization] (Justin Stevens) |
** Reconstruction Results (Simon Taylor & Others) | ** Reconstruction Results (Simon Taylor & Others) | ||
− | ***[ | + | ***[https://halldweb.jlab.org/DocDB/0029/002974/001/multiphoton_mar16.pdf A first look at multi-photon final states] |
* Offline Activities [[GlueX Offline Meeting, March 2, 2016|March 2, 2016]] | * Offline Activities [[GlueX Offline Meeting, March 2, 2016|March 2, 2016]] | ||
** Software Status | ** Software Status | ||
Line 34: | Line 37: | ||
** Offline Monitoring | ** Offline Monitoring | ||
** Calibration [[March 9, 2016 Calibration| March 9, 2016]] - [[Calibration Dashboard]] | ** Calibration [[March 9, 2016 Calibration| March 9, 2016]] - [[Calibration Dashboard]] | ||
− | ** Calibration Passes on Data | + | ** [[Calibration_Train#Run_Groups|Calibration Passes on Data]] |
* Physics and Analysis [[March 7, 2016, Physics Working Group|March 7, 2016]] | * Physics and Analysis [[March 7, 2016, Physics Working Group|March 7, 2016]] | ||
** Physics Working Group | ** Physics Working Group |
Latest revision as of 12:38, 14 March 2017
Contents
Meeting Time and Place
The meeting will be on Wednesday March 16, 2016 at 11:15am EDT. For those people at Jefferson Lab, the meeting will be in room F326.
Meeting Connections
- To join via a Web Browser, go to the page [1] https://bluejeans.com/660743227.
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 660743227.
- To join via phone, use one of the following numbers and the Conference ID: 660743227.
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- Upon connection all microphones are automatically muted. To unmute your mike on a Polycom or equivalent unit, enter *4. Unmuting on a computer is trivial as there is a microphone button than can be clicked.
- More information on connecting to bluejeans is available.
Agenda
Announcements
- Accelerator Update
- Nuclear Photoproduction with GlueX April 28-29
- Collaboration Meeting May 9-11
- Analysis Workshop after May Collaboration Meeting, May 11-13
Run Planning for Spring 2016
- Run Coordination Meetings: Spring 2016 Run
- Progress report for the last two weeks: File:RC report gluex weekly march16 2016.pdf
- Time charts for the last 4 weeks, readjusted for the CHL repair
- Shift Schedule
Analysis Activities
- Results from the Spring 2016 Run.
- Photon Polarization (Justin Stevens)
- Reconstruction Results (Simon Taylor & Others)
- Offline Activities March 2, 2016
- Software Status
- Data Challenge 3
- Offline Monitoring
- Calibration March 9, 2016 - Calibration Dashboard
- Calibration Passes on Data
- Physics and Analysis March 7, 2016
- Physics Working Group
- Analysis Activities Reaction page with plugins
Data Acquisition and Electronics Systems
- Online Systems January 27, 2016
- DAQ
- Controls Status
- Monitoring
- Level-3 Trigger
- Electronics and Trigger
- Electronics Update
- FADC FPGA Jan 28, 2016
- Level-1 Trigger
Detector Updates
- Engineering Activities
- Target
- Magnets
- Other Activities
- Beamline Status March 14, 2016
- Diamonds
- Active Collimator
- Pair Spectrometer
- Hodoscope
- Microscope
- Polarimeter
- Start Counter January 28, 2016
- Tracking March 10, 2016
- CDC
- FDC
- Calorimeters: March 10, 2016
- BCAL
- FCAL
- TOF March 8, 2016
- DIRC System March 11, 2016 PID Upgrade
Other Activities
- AOT