Difference between revisions of "BLTWG Meeting 5/15/2008"

From GlueXWiki
Jump to: navigation, search
(Notes by R. Jones)
Line 9: Line 9:
 
===Notes by R. Jones===
 
===Notes by R. Jones===
 
-----
 
-----
====Updates to Beamline Specifications [RTJ]
+
====Updates to Beamline Specifications [RTJ]====
 
In preparation for discussion of the pair spectrometer specification, I went over the [[Photon Beam Design Requirements|Global Specifications for the Hall D Photon Beam]] page.
 
In preparation for discussion of the pair spectrometer specification, I went over the [[Photon Beam Design Requirements|Global Specifications for the Hall D Photon Beam]] page.
  

Revision as of 12:58, 15 May 2008

  • Time: 10:00 EST
  • Place: EVO and ESNET
  • Present: Jim Whitlatch, Tim Stewart, Richard Jones, Franz Klein, Dan Sober, Elke Aschenaur, Eugene Chudakov

Agenda

  1. Discussion of the pair spectrometer specifications
  2. Items required for the Lehmann Review

Notes by R. Jones


Updates to Beamline Specifications [RTJ]

In preparation for discussion of the pair spectrometer specification, I went over the Global Specifications for the Hall D Photon Beam page.

Pair Spectrometer Specification

The discussion centered around the main tasks that the Hall D pair spectrometer must be designed to perform.

  1. monitoring the photon beam spectrum This is needed for polarized beam running in order to be able to continuously monitor the polarization of the beam.

Action Items