Difference between revisions of "BLTWG Meeting 5/15/2008"
From GlueXWiki
(→Notes by R. Jones) |
|||
Line 9: | Line 9: | ||
===Notes by R. Jones=== | ===Notes by R. Jones=== | ||
----- | ----- | ||
− | ====Updates to Beamline Specifications [RTJ] | + | ====Updates to Beamline Specifications [RTJ]==== |
In preparation for discussion of the pair spectrometer specification, I went over the [[Photon Beam Design Requirements|Global Specifications for the Hall D Photon Beam]] page. | In preparation for discussion of the pair spectrometer specification, I went over the [[Photon Beam Design Requirements|Global Specifications for the Hall D Photon Beam]] page. | ||
Revision as of 12:58, 15 May 2008
- Time: 10:00 EST
- Place: EVO and ESNET
- Present: Jim Whitlatch, Tim Stewart, Richard Jones, Franz Klein, Dan Sober, Elke Aschenaur, Eugene Chudakov
Contents
Agenda
- Discussion of the pair spectrometer specifications
- Items required for the Lehmann Review
Notes by R. Jones
Updates to Beamline Specifications [RTJ]
In preparation for discussion of the pair spectrometer specification, I went over the Global Specifications for the Hall D Photon Beam page.
Pair Spectrometer Specification
The discussion centered around the main tasks that the Hall D pair spectrometer must be designed to perform.
- monitoring the photon beam spectrum This is needed for polarized beam running in order to be able to continuously monitor the polarization of the beam.