Difference between revisions of "BLTWG Meeting 5/15/2008"

From GlueXWiki
Jump to: navigation, search
(Notes by R. Jones)
(Notes by R. Jones)
Line 10: Line 10:
 
-----
 
-----
 
====Updates to Beamline Specifications [RTJ]====
 
====Updates to Beamline Specifications [RTJ]====
In preparation for discussion of the pair spectrometer specification, I went over the [[Photon Beam Design Requirements|Global Specifications for the Hall D Photon Beam]] page.
+
In preparation for discussion of the pair spectrometer specification, I went over the [[Photon Beam Design Requirements|Global Specifications for the Hall D Photon Beam]] page.  A number of these items have come under scrutiny during the last few months, and some of them need to be changed.  I have updated the following items in the Global Specifications table on [[Photon Beam Design Requirements|the main beamline specs wiki page]].
  
 
====Pair Spectrometer Specification====
 
====Pair Spectrometer Specification====

Revision as of 13:45, 15 May 2008

  • Time: 10:00 EST
  • Place: EVO and ESNET
  • Present: Jim Whitlatch, Tim Stewart, Richard Jones, Franz Klein, Dan Sober, Elke Aschenaur, Eugene Chudakov

Agenda

  1. Discussion of the pair spectrometer specifications
  2. Items required for the Lehmann Review

Notes by R. Jones


Updates to Beamline Specifications [RTJ]

In preparation for discussion of the pair spectrometer specification, I went over the Global Specifications for the Hall D Photon Beam page. A number of these items have come under scrutiny during the last few months, and some of them need to be changed. I have updated the following items in the Global Specifications table on the main beamline specs wiki page.

Pair Spectrometer Specification

The discussion centered around the main tasks that the Hall D pair spectrometer must be designed to perform.

  1. monitoring the photon beam spectrum This is needed for polarized beam running in order to be able to continuously monitor the polarization of the beam.

Action Items