Difference between revisions of "JEF meeting, December 13, 2017"
From GlueXWiki
m |
(→Minutes) |
||
Line 29: | Line 29: | ||
Attendees: J. Crafts, L. Gan, S. Glamazdin, Z. Papandreou, S. Somov, S. Taylor, | Attendees: J. Crafts, L. Gan, S. Glamazdin, Z. Papandreou, S. Somov, S. Taylor, | ||
* S. Glamazdin studied 2 designs for shielding the PMTs in the insert using TOSCA: | * S. Glamazdin studied 2 designs for shielding the PMTs in the insert using TOSCA: | ||
− | ** Design 1: individual | + | ** A longitudinal field of 60 Oersted was assumed |
− | *** Reduction down to ~0.5 Gauss with a rapid rise toward the face of the steel in z | + | ** Design 1: individual pipes of 1010 steel + 1 layer of mu-metal (360 microns) for each PMT |
+ | *** Reduction down to ~<0.5 Gauss is possible but with a rapid rise toward the face of the steel in z | ||
+ | *** Studies suggest need for a ~3cm long light guide | ||
+ | ** Design 2: steel box with 4 mm thick walls housing entire insert | ||
+ | *** Shielding improved when an additional 1 cm thick plate was placed at the back of the insert | ||
+ | *** Shielding also improved when the tube for the beam hole was included | ||
+ | *** Looks possible to reduce field down to the level where mu-metal should be sufficient to further reduce the field down to where the PMTs will see low enough field. | ||
+ | *** Sasha will study what happens if the wall thickness of the box is reduced and if the hole for the beam is reduced. | ||
+ | *S. Somov reported that an assembly of iron tubes will be assembled and studied with field in Hall D. | ||
+ | * Zisis reported on less expensive SiPM options from SensL |
Revision as of 17:02, 13 December 2017
Meeting time and location= 10:00 am EST (JLab time) CC-B101
Connection instructions
We are using BlueJeans Video/Audio conferencing. Our meeting ID number is 370588741. Click "Expand" for more details.
- Make sure you have created a BlueJeans account via your JLab CUE account using this link:
- http://jlab.bluejeans.com (You should only need to do this once)
- If connecting via Web Browser: click this link (no passcode is needed):
- If connecting via Phone: Dial one of the following numbers and then enter the meeting ID above and hit "#" or "##"
- Dial: 1 888 240 2560 (US or Canada only)
- or, List of International Numbers
- If connecting via Polycom unit:
- Dial 199.48.152.152 or bjn.vc
- Enter meeting ID above
Agenda
- FCAL II budget
- Magnetic shielding options (S. Glamazdin)
Minutes
Attendees: J. Crafts, L. Gan, S. Glamazdin, Z. Papandreou, S. Somov, S. Taylor,
- S. Glamazdin studied 2 designs for shielding the PMTs in the insert using TOSCA:
- A longitudinal field of 60 Oersted was assumed
- Design 1: individual pipes of 1010 steel + 1 layer of mu-metal (360 microns) for each PMT
- Reduction down to ~<0.5 Gauss is possible but with a rapid rise toward the face of the steel in z
- Studies suggest need for a ~3cm long light guide
- Design 2: steel box with 4 mm thick walls housing entire insert
- Shielding improved when an additional 1 cm thick plate was placed at the back of the insert
- Shielding also improved when the tube for the beam hole was included
- Looks possible to reduce field down to the level where mu-metal should be sufficient to further reduce the field down to where the PMTs will see low enough field.
- Sasha will study what happens if the wall thickness of the box is reduced and if the hole for the beam is reduced.
- S. Somov reported that an assembly of iron tubes will be assembled and studied with field in Hall D.
- Zisis reported on less expensive SiPM options from SensL