Difference between revisions of "January 9, 2018 DIRC"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 22: | Line 22: | ||
# Bar box transportation | # Bar box transportation | ||
#* Planning for final 3 bar boxes | #* Planning for final 3 bar boxes | ||
+ | #** Bar box out of crate in Hall D [https://halldweb.jlab.org/wiki/index.php/File:IMG_2674.JPG]. Plans for crate shipment to IU. | ||
#** Monitoring System (John and Yunjie) [https://halldweb.jlab.org/wiki/images/d/d5/ThreeBoxMonitoring010918.pdf Pricing for system][https://halldweb.jlab.org/wiki/images/8/8e/WSDA-200-USB_Datasheet_%288400-0103%29RevA-1.pdf new base station] | #** Monitoring System (John and Yunjie) [https://halldweb.jlab.org/wiki/images/d/d5/ThreeBoxMonitoring010918.pdf Pricing for system][https://halldweb.jlab.org/wiki/images/8/8e/WSDA-200-USB_Datasheet_%288400-0103%29RevA-1.pdf new base station] | ||
#** Gas system (John) | #** Gas system (John) |
Revision as of 09:11, 9 January 2018
Meeting Information
GlueX DIRC Meeting
Tuesday January 9, 2018
1:00 pm, EDT
JLab room A110
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Announcements
- New meeting time doodle poll
- Support structure update (John, Tim, Tom)
- Roll fixture testing
- Bar box transportation
- Planning for final 3 bar boxes
- Bar box out of crate in Hall D [2]. Plans for crate shipment to IU.
- Monitoring System (John and Yunjie) Pricing for systemnew base station
- Gas system (John)
- Temporary storage for bar boxes in the hall
- Dates to discuss with SLAC?
- Planning for final 3 bar boxes
- Optical box
- Design drawings and PMT mounting update (Ernie and Jason)
- Questions to drawing package: STEP file
- The weld callout for the 1/8 inch plate to the frame calls for a 25mm fillet (see attached). Is this true?
- Ernie: It is supposed to be a 2 mm weld, every 25 mm. Let me look at the drawing and see if there is a mistake.
- What is the fillet weld size on the inside of frame (opposite the seam weld)?
- Ernie: We are going to review this one more time before we supply an answer.
- The weld callout for the 1/8 inch plate to the frame calls for a 25mm fillet (see attached). Is this true?
- Questions to drawing package: STEP file
- When should we expect to have a prototype of the “red bracket” to test the PMT mounting?
- This will help in coordinating travel and when we’ll need to loan you a PMT/electronics board module from JLab for these tests.
- Presentation on assembly sequence (Ernie and Jason)
- Simulation studies: hit patterns (Maria and Roman)
- Design drawings and PMT mounting update (Ernie and Jason)
- MAPMT testing (Bill)
- AOB