(Created page with "== Meeting Information == GlueX DIRC Optical Box Meeting<br> Thursday February 1, 2018<br> 10:00 am, EDT<br> Hall D Counting House <br> == Connection Using Bluejeans == # To...") |
(→Agenda) |
||
(One intermediate revision by the same user not shown) | |||
Line 16: | Line 16: | ||
== Agenda == | == Agenda == | ||
− | + | # Optical box status | |
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | # Optical box | + | |
− | + | ||
#* Status update (Ernie and Jason) | #* Status update (Ernie and Jason) | ||
#** Box production at Lesker: final production drawings (?) | #** Box production at Lesker: final production drawings (?) | ||
Line 30: | Line 22: | ||
#** Other items and quotes | #** Other items and quotes | ||
#** Followup on questions to drawing package (postpone to engineering meetings?): [https://www.dropbox.com/s/rvsubsp62145w6x/GLUEX%20FOB%20MK2%20BOX%20WELDMENT%20LH.STEP?dl=0 STEP file] | #** Followup on questions to drawing package (postpone to engineering meetings?): [https://www.dropbox.com/s/rvsubsp62145w6x/GLUEX%20FOB%20MK2%20BOX%20WELDMENT%20LH.STEP?dl=0 STEP file] | ||
+ | # Discussion of assembly procedure | ||
+ | #* Detailed proposals to be prepared for the next meeting (2 weeks) |
Latest revision as of 08:19, 1 February 2018
Meeting Information
GlueX DIRC Optical Box Meeting
Thursday February 1, 2018
10:00 am, EDT
Hall D Counting House
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Optical box status
- Status update (Ernie and Jason)
- Box production at Lesker: final production drawings (?)
- PMT test fixture
- Other items and quotes
- Followup on questions to drawing package (postpone to engineering meetings?): STEP file
- Status update (Ernie and Jason)
- Discussion of assembly procedure
- Detailed proposals to be prepared for the next meeting (2 weeks)