<- Back to [[Run Coordination Meetings:Fall2017 Spring2018 Run]] | <- Back to [[Run Coordination Meetings:Fall2017 Spring2018 Run]] | ||
+ | |||
+ | == Friday, February 2 == | ||
+ | # Notes from the previous 24 hours: | ||
+ | #* ? hours of CW beam. ABU: ? hrs (?), BANU: ? hrs (?) | ||
+ | #* [https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit#gid=1635471172 Spreadsheet: number of triggers]. | ||
+ | #* Low level monitoring | ||
+ | # Issues: | ||
+ | # Today's run plan [https://halldweb.jlab.org/hdops/wiki/index.php/Main_Page Google Calendar]: | ||
+ | #* Production running | ||
+ | #* 10 am: Min-bias trigger setup (Sasha) | ||
+ | #* 11:30 am: High intensity test (Sergey) | ||
+ | # Reports: | ||
+ | # Standing issues: | ||
+ | #* [https://logbooks.jlab.org/entry/3524060 Rate evolution]: Work ongoing to compare rho yields to PS flux before and after "step" in PS rate. | ||
+ | #* Polarization status? | ||
== Thursday, February 1 == | == Thursday, February 1 == |
Revision as of 12:25, 1 February 2018
<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run
Friday, February 2
- Notes from the previous 24 hours:
- ? hours of CW beam. ABU: ? hrs (?), BANU: ? hrs (?)
- Spreadsheet: number of triggers.
- Low level monitoring
- Issues:
- Today's run plan Google Calendar:
- Production running
- 10 am: Min-bias trigger setup (Sasha)
- 11:30 am: High intensity test (Sergey)
- Reports:
- Standing issues:
- Rate evolution: Work ongoing to compare rho yields to PS flux before and after "step" in PS rate.
- Polarization status?
Thursday, February 1
- Notes from the previous 24 hours:
- After empty target run, beam intermittent. Trouble setting up V-wire TAC run, due to lock on Active Collimator not providing consistent TAC rate.
- 8 PM start production TAC run with lock on Beam Profiler. TAC rate initially at ~200 kHz, but dropped to 100 kHz overnight.
- 5:30 AM stopped the TAC run and switch to production: target filled, beamline back in production configuration and production run started.
- 16.1 hours of CW beam. ABU: 14.4 hrs (4.9+3.5+6.0), BANU: 1.7 hrs (0.1+0.8+0.8)
- Spreadsheet: number of triggers.
- Low level monitoring
- Issues:
- Run plan for this week:
- Low intensity runs planned for tonight: what is the status of min-bias triggers?
- Today's run plan:
- At 9 AM (or after run production run 41172):
- Harp scans by MCC and Hall D (Hovanes on shift)
- Production running the rest of the day
- At 9 AM (or after run production run 41172):
- Reports:
- Standing issues:
- Rate evolution: Work ongoing to compare rho yields to PS flux before and after "step" in PS rate.
- Polarization status? Came up at MCC meeting, Eugene suggested to report next week.