Difference between revisions of "Run Planning Meeting Notes, Feb 15-Feb 21, 2018"
From GlueXWiki
(→Thursday, February 15) |
(→Thursday, February 15) |
||
Line 17: | Line 17: | ||
#* [https://logbooks.jlab.org/entry/3531993 Todd tried to improve beam optics but resulted in no change] | #* [https://logbooks.jlab.org/entry/3531993 Todd tried to improve beam optics but resulted in no change] | ||
#* Sergey and the DAQ group high intensity studies | #* Sergey and the DAQ group high intensity studies | ||
+ | #* AC scan moved to later time with stable beam | ||
#* Intensity scan [https://docs.google.com/spreadsheets/d/1UT3o4yJ-avlIQzmZKJo2nRrgVPzYKJvGPJ0oqAn81Oo/edit?usp=sharing statistics] | #* Intensity scan [https://docs.google.com/spreadsheets/d/1UT3o4yJ-avlIQzmZKJo2nRrgVPzYKJvGPJ0oqAn81Oo/edit?usp=sharing statistics] | ||
# Issues: | # Issues: |
Revision as of 09:43, 15 February 2018
<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run
Thursday, February 15
- Notes from the previous 24 hours:
- Controlled Access
- Hovanes put lead on the beam profiler for the v-wire study
- Colin and Matt replaced FCAL bases
- Lubomir went in for the FDC
- (in the evening) Alex B. went in to swap voltage adapters for the active collimator
- Hovanes made a V-wire study
- Todd tried to improve beam optics but resulted in no change
- Sergey and the DAQ group high intensity studies
- AC scan moved to later time with stable beam
- Intensity scan statistics
- Controlled Access
- Issues:
- Reports (?):
- Today's run plan Google Calendar:
- Accelerator down 4hr for "restoring corners" starting around 9am.
- Hall B Mott will be invasive, likely a couple hours without beam
- Controlled access during accelerator downtime
- Muon chamber work
- FCAL?
- Anyone else?
- Harp scan once beam returns
- AC scans
- Sasha trigger study