Difference between revisions of "Run Planning Meeting Notes, Mar 29-Apr 4, 2018"
From GlueXWiki
(→Friday, March 29 at 08:45) |
(→Friday, March 29 at 08:45) |
||
Line 30: | Line 30: | ||
#Issues: | #Issues: | ||
#* Some rootspy hiccups, hopefully fixed | #* Some rootspy hiccups, hopefully fixed | ||
− | #* Beam steering locks | + | #* Beam steering locks on 5C11B were off |
+ | #* Tagger quadrupole current had loaded incorrect default value during tuning! MCC will correct the default and add alarms. | ||
#* [[BTA guidelines]] | #* [[BTA guidelines]] | ||
# Reports: | # Reports: | ||
Line 38: | Line 39: | ||
#* Converter thickness study (Alex S., 2h) | #* Converter thickness study (Alex S., 2h) | ||
#* CDC high thresholds (Beni, 2h) | #* CDC high thresholds (Beni, 2h) | ||
− | #* Production running through weekend | + | #* Production running through weekend, with possible 0.5h trigger work from Alex S. |
+ | #* Over the weekend Richard will do prep work for the TAC run on Wed. | ||
# Next meeting: Sunday 10am | # Next meeting: Sunday 10am | ||
+ | # Thanks and best wishes to Tom Carstens in his retirement | ||
+ | == Sunday, April 1 at 10:00 == | ||
+ | # Notes from the previous 48 hours: | ||
+ | #* [https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard] | ||
+ | #Issues: | ||
+ | # Reports: | ||
+ | # Run Plan | ||
+ | #* [https://halldweb.jlab.org/wiki/index.php/File:Spring18_week12.jpg Schematic] | ||
+ | #* Production running through weekend, with possible 0.5h trigger work from Alex S. | ||
# AOB | # AOB |
Revision as of 10:46, 30 March 2018
<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run
Thursday, March 28 at 08:45
- Notes from the previous 24 hours:
- RF separator tested out ok, aimed to restore beam for swing shift but delayed due to CHL issues
- Beam arrived just before midnight, convergence not good, owl shift spent tuning
- 0800 MCC meeting notes - Todd retuning; planning machine work 4h Mon, 8h Tues MCC whiteboard
- Issues:
- Shift-takers should at least log any acknowledged alarms so that they are not forgotten
- Is there a how-to page for the BTA sheet? (load from epics, edit etc & guidelines on ABU/BANU)
- Reports:
- Run Plan
- Re-establish Photon beam
- 1h production to check beam quality & detectors
- Diamond spot adjustment (Hovanes, needs to start before noon or try again tomorrow)
- CDC Background Studies (Lubomir et al.)
- Converter thickness study (Alex S.)
- SSP Study (Alex S., postpone to early next week)
- Production running
- AOB
Friday, March 29 at 08:45
- Notes from the previous 24 hours:
- Todd retuned Hall D beamline Thursday morning, considerable improvement
- Hovanes set diamond positions but didn't have time for spot adjustment, #1 for today
- CDC background studies completed ?
- Beam became less reliable throughout swing shift, improved after midnight
- 0800 MCC meeting notes - beam studies 0830-1230 Monday
- MCC whiteboard
- Issues:
- Some rootspy hiccups, hopefully fixed
- Beam steering locks on 5C11B were off
- Tagger quadrupole current had loaded incorrect default value during tuning! MCC will correct the default and add alarms.
- BTA guidelines
- Reports:
- Run Plan
- Schematic
- Diamond spot adjustment (Hovanes, 2h)
- Converter thickness study (Alex S., 2h)
- CDC high thresholds (Beni, 2h)
- Production running through weekend, with possible 0.5h trigger work from Alex S.
- Over the weekend Richard will do prep work for the TAC run on Wed.
- Next meeting: Sunday 10am
- Thanks and best wishes to Tom Carstens in his retirement
Sunday, April 1 at 10:00
- Notes from the previous 48 hours:
- Issues:
- Reports:
- Run Plan
- Schematic
- Production running through weekend, with possible 0.5h trigger work from Alex S.
- AOB