Difference between revisions of "Run Planning Meeting Notes, Apr 26-May 2, 2018"
From GlueXWiki
m |
m |
||
Line 10: | Line 10: | ||
#* Production running | #* Production running | ||
#* BCal Pedestals [https://logbooks.jlab.org/entry/3567716] | #* BCal Pedestals [https://logbooks.jlab.org/entry/3567716] | ||
+ | #**Low current BPM lock test | ||
#Issues: | #Issues: | ||
#* Rootspy crashes [https://logbooks.jlab.org/entry/3567623] | #* Rootspy crashes [https://logbooks.jlab.org/entry/3567623] | ||
#* Running with 750 um converter | #* Running with 750 um converter | ||
− | |||
# Reports: | # Reports: | ||
# Run Plan | # Run Plan |
Revision as of 07:29, 27 April 2018
<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run
Friday, April 27 at 08:45
- Notes from the previous 24 hours:
- Production running
- BCal Pedestals [1]
- Low current BPM lock test
- Issues:
- Rootspy crashes [2]
- Running with 750 um converter
- Reports:
- Run Plan
- Friday
- High rate DAQ tests (9.30 am)
- TAC Run (2 pm)
- Saturday
- Production Running
- Sunday
- Production Running
- Longer term run plan
- Resumption of raster scan studies
- End of run preparation
- Be prepared to switch everything off after last beam at 6 am, SUNDAY May 6
- Friday
- AOB
Thursday, April 26 at 08:45
- Notes from the previous 24 hours:
- Replacement of TAGH FDC module [3]
- Production running
- High rate trigger tests
- Issues:
- Reports:
- Run Plan
- AOB