Difference between revisions of "Run Planning Meeting Notes, Apr 26-May 2, 2018"
From GlueXWiki
m |
|||
Line 5: | Line 5: | ||
* [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&ctz=America%2FNew_York Run Plan Google Calendar] | * [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&ctz=America%2FNew_York Run Plan Google Calendar] | ||
* [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Plan Google Calendar] | * [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Plan Google Calendar] | ||
+ | |||
+ | == Monday, April 30 at 08:45 == | ||
+ | # Notes from the weekend: | ||
+ | #* Production running | ||
+ | #Issues: | ||
+ | # Reports: | ||
+ | # Run Plan | ||
+ | #*Monday | ||
+ | #**Beam studies | ||
+ | #**Access(es) | ||
+ | #*Tuesday | ||
+ | #**RF recovery | ||
+ | #*Wednesday | ||
+ | #**12 GeV Inauguration Tour (at long last!) | ||
+ | #**TAC Run | ||
+ | #*Longer term run plan/Other items | ||
+ | #**Resumption of raster scan studies | ||
+ | #*End of run preparation | ||
+ | #**Be prepared to switch everything off after last beam at 6 am, SUNDAY May 6 | ||
+ | # AOB | ||
== Sunday, April 29 - No Meeting == | == Sunday, April 29 - No Meeting == |
Revision as of 01:22, 29 April 2018
<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run
Contents
Monday, April 30 at 08:45
- Notes from the weekend:
- Production running
- Issues:
- Reports:
- Run Plan
- Monday
- Beam studies
- Access(es)
- Tuesday
- RF recovery
- Wednesday
- 12 GeV Inauguration Tour (at long last!)
- TAC Run
- Longer term run plan/Other items
- Resumption of raster scan studies
- End of run preparation
- Be prepared to switch everything off after last beam at 6 am, SUNDAY May 6
- Monday
- AOB
Sunday, April 29 - No Meeting
Saturday, April 28 - No Meeting
Friday, April 27 at 08:45
- Notes from the previous 24 hours:
- Issues:
- Reports:
- High intensity DAQ tests [10]
- Running with 750 um converter [11]
- TPOL runtime estimate - R. Jones
- Run Plan
- Friday
- High rate DAQ tests (9.30 am)
- Injector recovery (MCC, possible beam down ~1hr)
- Level 1 trigger studies
- Saturday
- Production Running
- Sunday
- Production Running
- Longer term run plan/Other items
- Resumption of raster scan studies
- Access for Muon detector
- Tour
- TAC Run (Wednesday)
- End of run preparation
- Be prepared to switch everything off after last beam at 6 am, SUNDAY May 6
- Friday
- AOB
Thursday, April 26 at 08:45
- Notes from the previous 24 hours:
- Replacement of TAGH FDC module [12]
- Production running
- High rate trigger tests
- Issues:
- Reports:
- Run Plan
- AOB