Difference between revisions of "Run Planning Meeting Notes, Apr 26-May 2, 2018"
From GlueXWiki
(→Wednesday, May 2 at 08:45) |
m |
||
(2 intermediate revisions by the same user not shown) | |||
Line 9: | Line 9: | ||
# Notes from previous 24 hours: | # Notes from previous 24 hours: | ||
#* Production running | #* Production running | ||
− | #* Raster scan now working | + | #* Raster scan now working [https://logbooks.jlab.org/entry/3570432] |
− | #* MCC harp scans seem to be fine | + | #* MCC harp scans seem to be fine [https://logbooks.jlab.org/entry/3570199] |
# Issues: | # Issues: | ||
# Reports: | # Reports: | ||
Line 17: | Line 17: | ||
#*Wednesday | #*Wednesday | ||
#**RF recovery | #**RF recovery | ||
− | #**12 GeV | + | #**12 GeV Dedication Tour |
#** Access to uninstall muon chamber | #** Access to uninstall muon chamber | ||
− | |||
#*Thursday | #*Thursday | ||
− | |||
#**TAC Run | #**TAC Run | ||
+ | #** Raster Scan | ||
#*Friday | #*Friday | ||
#**Production Running | #**Production Running | ||
Line 28: | Line 27: | ||
#**Access to remove plate from beam profiler | #**Access to remove plate from beam profiler | ||
#*End of run preparation | #*End of run preparation | ||
− | #**Be prepared to switch | + | #**Be prepared to switch off after last beam at 6 am, SUNDAY May 6 |
#**Shutdown list | #**Shutdown list | ||
+ | #**Detectors | ||
+ | #***FCal [https://logbooks.jlab.org/entry/3570357] | ||
# AOB | # AOB | ||
Latest revision as of 08:40, 2 May 2018
<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run
Contents
Wednesday, May 2 at 08:45
- Notes from previous 24 hours:
- Issues:
- Reports:
- Run Plan
- Wednesday
- RF recovery
- 12 GeV Dedication Tour
- Access to uninstall muon chamber
- Thursday
- TAC Run
- Raster Scan
- Friday
- Production Running
- Longer term run plan/Other items
- Access to remove plate from beam profiler
- End of run preparation
- Be prepared to switch off after last beam at 6 am, SUNDAY May 6
- Shutdown list
- Detectors
- FCal [5]
- Wednesday
- AOB
Tuesday, May 1 at 08:45
- Notes from previous 24 hours:
- Issues:
- Reports:
- Run Plan
- Tuesday
- Production Running
- Raster Scan Studies
- Wednesday
- RF recovery
- 12 GeV Inauguration(!) Tour
- Access to uninstall muon chamber
- Thursday
- TAC Run
- Longer term run plan/Other items
- End of run preparation
- Be prepared to switch everything off after last beam at 6 am, SUNDAY May 6
- Shutdown list
- Tuesday
- AOB
Monday, April 30 at 08:45
- Notes from the weekend:
- Issues:
- TOF voltage failure [16]
- Gluon49 failure
- Open Door
- Reports:
- Run Plan
- Monday
- Beam studies
- Accesses
- TOF
- FCal
- Muon Chamber
- Tuesday
- RF recovery (moved to Wednesday)
- Wednesday
- 12 GeV Inauguration(!) Tour
- TAC Run (Move to Thursday?)
- Longer term run plan/Other items
- Resumption of raster scan studies
- End of run preparation
- Be prepared to switch everything off after last beam at 6 am, SUNDAY May 6
- Monday
- AOB
Sunday, April 29 - No Meeting
Saturday, April 28 - No Meeting
Friday, April 27 at 08:45
- Notes from the previous 24 hours:
- Issues:
- Reports:
- High intensity DAQ tests [30]
- Running with 750 um converter [31]
- TPOL runtime estimate - R. Jones
- Run Plan
- Friday
- High rate DAQ tests (9.30 am)
- Injector recovery (MCC, possible beam down ~1hr)
- Level 1 trigger studies
- Saturday
- Production Running
- Sunday
- Production Running
- Longer term run plan/Other items
- Resumption of raster scan studies
- Access for Muon detector
- Tour
- TAC Run (Wednesday)
- End of run preparation
- Be prepared to switch everything off after last beam at 6 am, SUNDAY May 6
- Friday
- AOB
Thursday, April 26 at 08:45
- Notes from the previous 24 hours:
- Replacement of TAGH FDC module [32]
- Production running
- High rate trigger tests
- Issues:
- Reports:
- Run Plan
- AOB