Difference between revisions of "Spring 2019 DIRC Commissioning"
From GlueXWiki
(→Commissioning Milestones) |
|||
Line 7: | Line 7: | ||
* Implement reconstruction algorithm and compare data/MC: # detected photons, Cherenkov angle resolution | * Implement reconstruction algorithm and compare data/MC: # detected photons, Cherenkov angle resolution | ||
− | == Commissioning Milestones == | + | == Commissioning Tasks and Milestones == |
* TBD | * TBD | ||
Revision as of 09:53, 28 June 2018
Contents
Commissioning Goals
- Integrate DIRC readout with general Hall D DAQ and online/offline monitoring
- Calibrate per-pixel timing offset of MAPMTs using LED system
- Determine geometric alignment parameters (position and angle offsets) for optical components
- Implement reconstruction algorithm and compare data/MC: # detected photons, Cherenkov angle resolution
Commissioning Tasks and Milestones
- TBD
Simulation studies for commissioning
Requirements
- Final geometry in CCDB with appropriate run number
- Define JANA calibration variation for CCDB specific to DIRC(?)
- LUT algorithm implemented as factor in DIRC sim-recon library
Data Samples
- bggen sample (1M events) for comparison of rates and occupancies with data
- single track pion and kaon samples in kinematic bins for comparison with data