#* New meeting time for Fall semester: Mondays at 1 pm | #* New meeting time for Fall semester: Mondays at 1 pm | ||
# Optical box | # Optical box | ||
− | #* Successful mechanical installation (Tim, All) | + | #* Successful mechanical installation (Tim, Ernie, All) |
#** Logbook [https://logbooks.jlab.org/entry/3587439] [https://logbooks.jlab.org/entry/3587832] [https://logbooks.jlab.org/entry/3587462] | #** Logbook [https://logbooks.jlab.org/entry/3587439] [https://logbooks.jlab.org/entry/3587832] [https://logbooks.jlab.org/entry/3587462] | ||
#* Fabrication status update (Ernie and Jason) | #* Fabrication status update (Ernie and Jason) |
Revision as of 12:18, 20 August 2018
Meeting Information
GlueX DIRC Meeting
Monday August 20, 2018
2:00 pm, EDT
JLab room A110
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Announcements
- New meeting time for Fall semester: Mondays at 1 pm
- Optical box
- Successful mechanical installation (Tim, Ernie, All)
- Fabrication status update (Ernie and Jason)
- Quartz window flange modification
- Mirror cutting and installation
- Dark box enclosure (Jason)
- Plans for ESB and full installation:testing and installation schedule
- Mirror box laser alignment geometry and laser projections (Bill/Stephanie)
- DAQ integration
- Sergey successfully read out SSP with 2 FPGA boards in DIRC crate with production DAQ
- David Lawrence is developing EVIO parser based on this data, then a translation table will be developed
- MAPMT testing
- Magnetic field test initial results (Bill and Andrew)
- Software/simulations
- Software overview and tasks (All)
- Finalizing DIRC "as-built" geometry: support frames, bar box internals, etc. (Yunjie)
- Simulation samples for commissioning plans (Justin)