Difference between revisions of "Run Planning Meeting Notes, Oct 11-Oct 17, 2018"
From GlueXWiki
Line 1: | Line 1: | ||
== Thursday, Oct 11 at 08:45 == | == Thursday, Oct 11 at 08:45 == | ||
# Notes from the past 24 hours: | # Notes from the past 24 hours: | ||
− | #* Beam issues most of swing (7hrs to | + | #* Beam issues most of swing (7hrs to complete amorphous run) and owl shift (~1hr of beam in total). |
− | + | ||
#CEBAF | #CEBAF | ||
#* 5th pass separator failed during swing shift and into the beginning of owl. Beam back at 3:20am. | #* 5th pass separator failed during swing shift and into the beginning of owl. Beam back at 3:20am. | ||
Line 11: | Line 10: | ||
#* [https://logbooks.jlab.org/entry/3607600 Lots of issues with DAQ- rocCDC2] | #* [https://logbooks.jlab.org/entry/3607600 Lots of issues with DAQ- rocCDC2] | ||
#Reports | #Reports | ||
− | #*[ Monitoring Report] | + | #*[https://logbooks.jlab.org/entry/3607590 Monitoring Report] |
#* [https://halldweb.jlab.org/data_monitoring/Plot_Browser.html Plot Browser] | #* [https://halldweb.jlab.org/data_monitoring/Plot_Browser.html Plot Browser] | ||
#*[https://logbooks.jlab.org/entry/3607032 Rate and Energy Monitoring] | #*[https://logbooks.jlab.org/entry/3607032 Rate and Energy Monitoring] |
Revision as of 08:27, 11 October 2018
Thursday, Oct 11 at 08:45
- Notes from the past 24 hours:
- Beam issues most of swing (7hrs to complete amorphous run) and owl shift (~1hr of beam in total).
- CEBAF
- 5th pass separator failed during swing shift and into the beginning of owl. Beam back at 3:20am.
- PSS drop in the machine at 3:30 am. No beam until 6am.
- Action Items
- Issues
- Reports
- Run Plan
- Need to schedule a TAC run
- Can we do this opportunistically?
- Use bleedthrough current?
- Hall C plans to switch experiments on approximately the 22nd. This is around the time of accelerator maintenance, so they may plan to switch experiments then.
- Hurricane Michael closely approaching. Do we need to take any precautions?
- Week 4 Week 5
- Beam Studies Monday
- RF Recovery Monday
- Need to schedule a TAC run
- AOB