Difference between revisions of "Controls Meeting 1-Nov-2018"
From GlueXWiki
(3 intermediate revisions by the same user not shown) | |||
Line 4: | Line 4: | ||
* ComCal | * ComCal | ||
** Timeline for testing, hall openings | ** Timeline for testing, hall openings | ||
− | ** Temperature monitoring, tags and PVs (Nick) | + | ** Temperature monitoring, tags and PVs (Nick)[[Media:Graphicallylocated sensors.png | GUI]] |
** Interlocks (Nick) | ** Interlocks (Nick) | ||
** LED pulser (Hovanes) | ** LED pulser (Hovanes) |
Latest revision as of 09:54, 1 November 2018
- Announcements
- Solenoid status (Tim,Beni,Brian)
- Liquid level : sensors vs formulae
- ComCal
- Timeline for testing, hall openings
- Temperature monitoring, tags and PVs (Nick) GUI
- Interlocks (Nick)
- LED pulser (Hovanes)
- Voltages (Hovanes)
- Reset after interlock?
- Chiller
- Translation stages (Tim)
- DIRC controls
- Voltages (Nick, Hovanes)
- LED Pulser (Hovanes)
- Envoronemt (Nick)
- Interlocks (Nick)
- Scalers and Temperatures (Hovanes)
- Other
Time/Location
10:00AM Thursday 1-Nov-2018 CC B101