Difference between revisions of "January 7, 2019 DIRC"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
(One intermediate revision by the same user not shown) | |||
Line 24: | Line 24: | ||
#** [https://logbooks.jlab.org/entry/3640620 Cooling test] | #** [https://logbooks.jlab.org/entry/3640620 Cooling test] | ||
#** [https://logbooks.jlab.org/entry/3641311 Light tightness test] | #** [https://logbooks.jlab.org/entry/3641311 Light tightness test] | ||
− | #* Quartz window RTV'd for lower box and delivery to JLab on Monday, upper box | + | #* Quartz window RTV'd for lower box and delivery to JLab on Monday, upper box window to be installed next Monday (Ernie) |
#* LED fiber feedthroughs installation (Bill, Kieth) | #* LED fiber feedthroughs installation (Bill, Kieth) | ||
# Software/simulations | # Software/simulations | ||
− | #* Finalizing DIRC "as-built" geometry: JT model from survey/alignment (Yunjie) | + | #* Finalizing DIRC "as-built" geometry: JT model from survey/alignment (Yunjie/Stephanie) |
#* LED generator and timing calibration (Yunjie) | #* LED generator and timing calibration (Yunjie) | ||
#* Time-based studies and adding # photons to LUT likelihood (Maria) | #* Time-based studies and adding # photons to LUT likelihood (Maria) |
Latest revision as of 13:02, 7 January 2019
Meeting Information
GlueX DIRC Meeting
Monday January 7, 2019
1:00 pm, EDT
JLab Hall D counting house
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Announcements
- New meeting time for Spring semester: Doodle poll
- Installation status (All)
- Before holiday shutdown (Tim)
- Upper bar boxes installed (Matt, Tim)
- Dark box enclosure light tightness and cooling tests (All)
- Quartz window RTV'd for lower box and delivery to JLab on Monday, upper box window to be installed next Monday (Ernie)
- LED fiber feedthroughs installation (Bill, Kieth)
- Software/simulations
- Finalizing DIRC "as-built" geometry: JT model from survey/alignment (Yunjie/Stephanie)
- LED generator and timing calibration (Yunjie)
- Time-based studies and adding # photons to LUT likelihood (Maria)
- Alignment updates (Cris)
- Software overview and tasks (All)
- Many recent updates to dirc_commissioning_2018 branches, expect to go on master later on Wednesday
- Spring 2019 DIRC Commissioning (All)
- Addressing ERR review recommendations
- AOB