Difference between revisions of "Run Planning Meeting Notes, Feb 21 - Feb 27, 2019"
From GlueXWiki
m (Jonesrt moved page Run Planning Meeting Notes, Feb. 21-Feb 27, 2019 to Run Planning Meeting Notes, Feb 21 - Feb 27, 2019) |
|||
(22 intermediate revisions by one other user not shown) | |||
Line 19: | Line 19: | ||
#** Beam conditions? | #** Beam conditions? | ||
− | == | + | == Friday, Feb. 22 at 08:45 == |
# Past 24 hours: | # Past 24 hours: | ||
#* [https://logbooks.jlab.org/entry/3657152 PrimEx configuration change] | #* [https://logbooks.jlab.org/entry/3657152 PrimEx configuration change] | ||
Line 33: | Line 33: | ||
#* Bleedthrough studies? | #* Bleedthrough studies? | ||
#* Meeting tomorrow? | #* Meeting tomorrow? | ||
+ | |||
+ | == Monday, Feb. 25 at 08:45 == | ||
+ | # Past 24 hours: | ||
+ | #* Friday: | ||
+ | #** [https://logbooks.jlab.org/entry/3657540 Monitoring updated for Primex] | ||
+ | #** CCAL snake scan | ||
+ | #** Nonlinearity studies | ||
+ | #* Saturday: | ||
+ | #** Snake scan redux | ||
+ | #** CCAL-as-TAC runs | ||
+ | #** Other studies? | ||
+ | #* Sunday | ||
+ | #** More calibrations - [https://logbooks.jlab.org/entry/3659002 gain results] | ||
+ | #** Empty target run | ||
+ | # Issues | ||
+ | #* [https://logbooks.jlab.org/entry/3657890 Friday DAQ problems] | ||
+ | #* DAQ crashes [https://logbooks.jlab.org/entry/3658041] [https://logbooks.jlab.org/entry/3658110] | ||
+ | #* [https://logbooks.jlab.org/entry/3657867 Translation table updates] | ||
+ | #* [https://logbooks.jlab.org/entry/3658895 DIRC alarm] | ||
+ | #* [https://logbooks.jlab.org/entry/3659172 Low energy background] | ||
+ | #* [https://www.jlab.org/Hall-D/shifts/ shifts need to be filled later this week] | ||
+ | # Today: | ||
+ | #* Be target installation 6 AM - 6 PM | ||
+ | #* Compton data on Be | ||
+ | |||
+ | == Tuesday, Feb. 26 at 08:45 == | ||
+ | # Run plan discussion | ||
+ | # Past 24 hours: | ||
+ | #* Be target installation [https://logbooks.jlab.org/entry/3659417] [https://logbooks.jlab.org/entry/3659507] | ||
+ | #* [https://logbooks.jlab.org/entry/3659711 Trigger setup] | ||
+ | #* [https://logbooks.jlab.org/entry/3659759 Compton Production]: ~500M triggers | ||
+ | #** First production run: 61321 | ||
+ | # Issues | ||
+ | #* [https://logbooks.jlab.org/entry/3659416 DIRC humidity alarm limits changed] | ||
+ | # Today: | ||
+ | #* Beam studies: 8 AM - noon? | ||
+ | #* Compton data on Be | ||
+ | |||
+ | == Wednesday, Feb. 27 at 08:45 == | ||
+ | # Past 24 hours: | ||
+ | #* Rate studies | ||
+ | #* Compton Production: ~900M triggers | ||
+ | #** [https://logbooks.jlab.org/entry/3660500 Monitoring results] | ||
+ | #* [https://logbooks.jlab.org/entry/3660207 Non-linearity studies] | ||
+ | # Issues | ||
+ | #* Unstable beam on swing shift | ||
+ | #* [https://logbooks.jlab.org/entry/3660067 FCAL base changes] | ||
+ | #* [https://logbooks.jlab.org/entry/3660461 Alarms - communication problem?] | ||
+ | #* PS current 840A or 850A? | ||
+ | # Today: | ||
+ | #* Compton data on Be | ||
+ | #* Remove target tomorrow at 8 AM |
Latest revision as of 07:19, 21 March 2019
Contents
Thursday, Feb. 21 at 08:45
- Past 24 hours:
- CPP test successful!
- Issues
- TOF RF Problem solved! (Beni) [1] [2]
- FCAL LED pulser stuck
- Beam current stability [3] [4]
- Today:
- Hall in controlled/restricted access until 5 PM
- CCAL calibration run
- Beam conditions?
Friday, Feb. 22 at 08:45
- Past 24 hours:
- PrimEx configuration change
- CCAL snake scan
- Configuration
- Environment
- Data taking started at 1 AM
- 17/140 channels scanned
- Issues
- Today:
- Data taking plan
- Bleedthrough studies?
- Meeting tomorrow?
Monday, Feb. 25 at 08:45
- Past 24 hours:
- Friday:
- Monitoring updated for Primex
- CCAL snake scan
- Nonlinearity studies
- Saturday:
- Snake scan redux
- CCAL-as-TAC runs
- Other studies?
- Sunday
- More calibrations - gain results
- Empty target run
- Friday:
- Issues
- Today:
- Be target installation 6 AM - 6 PM
- Compton data on Be
Tuesday, Feb. 26 at 08:45
- Run plan discussion
- Past 24 hours:
- Be target installation [7] [8]
- Trigger setup
- Compton Production: ~500M triggers
- First production run: 61321
- Issues
- Today:
- Beam studies: 8 AM - noon?
- Compton data on Be
Wednesday, Feb. 27 at 08:45
- Past 24 hours:
- Rate studies
- Compton Production: ~900M triggers
- Non-linearity studies
- Issues
- Unstable beam on swing shift
- FCAL base changes
- Alarms - communication problem?
- PS current 840A or 850A?
- Today:
- Compton data on Be
- Remove target tomorrow at 8 AM