Difference between revisions of "July 23, 2019 DIRC"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 20: | Line 20: | ||
#* Mirror studies: | #* Mirror studies: | ||
#** [https://logbooks.jlab.org/entry/3706827 Strongback disassembly and mirror reflectivity measurements] (Bill) | #** [https://logbooks.jlab.org/entry/3706827 Strongback disassembly and mirror reflectivity measurements] (Bill) | ||
− | #** Tests of composition from oxidized surfaces (Eugene/Bill) | + | #** [https://logbooks.jlab.org/entry/3708280 Tests of composition from oxidized surfaces] (Eugene/Bill) |
#* Epoxy test samples to prevent corrosion of exposed aluminum surfaces (Tim, Bill, All) | #* Epoxy test samples to prevent corrosion of exposed aluminum surfaces (Tim, Bill, All) | ||
#** Results from UV enhanced mirror in water sample with DP190 | #** Results from UV enhanced mirror in water sample with DP190 |
Revision as of 14:00, 22 July 2019
Meeting Information
GlueX DIRC Meeting
Tuesday July 23, 2019
1:00 pm, EDT
JLab F326
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Announcements
- Installation work:
- Mirror studies:
- Epoxy test samples to prevent corrosion of exposed aluminum surfaces (Tim, Bill, All)
- Results from UV enhanced mirror in water sample with DP190
- Next steps:
- Receive mirror from Bates and have cut for additional sample pieces (Wednesday 7/24)
- Decide on epoxy for pin holes of Upper (North) OB. Apply epoxy and re-install mirror box in OB for installation
- After receiving gold-plated screws, install in upper bar boxes and proceed with installing North OB
- Spring 2019 DIRC Commissioning Analysis (All)
- Commissioning LUT analyses (All)
- Contributions to Jerry's DIRC review article (Yunjie, All)
- Software/simulations
- FastDIRC geometry implementation and alignment work (Cris/Yunjie)
- Software overview and tasks (All)
- AOB