Difference between revisions of "November 25, 2019 DIRC"
From GlueXWiki
Line 25: | Line 25: | ||
#* [https://logbooks.jlab.org/entry/3741420 FPGA temperatures in EPICS] and now give an alarm if they exceed 60 C. | #* [https://logbooks.jlab.org/entry/3741420 FPGA temperatures in EPICS] and now give an alarm if they exceed 60 C. | ||
#* [https://logbooks.jlab.org/entry/3742190 DIRC moved to beam position] | #* [https://logbooks.jlab.org/entry/3742190 DIRC moved to beam position] | ||
− | # | + | #* Surveys are complete: initial values consistent with Spring 2019 surveys |
# Readout/DAQ tests and issues (Justin, Bill, All) | # Readout/DAQ tests and issues (Justin, Bill, All) | ||
#* [https://logbooks.jlab.org/entry/3741252 Missing pixel] and [https://logbooks.jlab.org/entry/3742308 appearance of dummy pixels] | #* [https://logbooks.jlab.org/entry/3741252 Missing pixel] and [https://logbooks.jlab.org/entry/3742308 appearance of dummy pixels] | ||
#* [https://logbooks.jlab.org/entry/3742298 Poor livetime when EPICs IOC is running at 100% CPU usage], crate controller CPU replaced (with 8 cores) [https://logbooks.jlab.org/entry/3742617 problem resolved] | #* [https://logbooks.jlab.org/entry/3742298 Poor livetime when EPICs IOC is running at 100% CPU usage], crate controller CPU replaced (with 8 cores) [https://logbooks.jlab.org/entry/3742617 problem resolved] | ||
− | #* | + | #* [https://logbooks.jlab.org/entry/3742832 Missing module due to HV connector failure]. Swapped to [https://logbooks.jlab.org/entry/3742892 a spare connector and resolved] |
# [https://logbooks.jlab.org/entry/3741413 Spare electronics] (Bill, Andrew) | # [https://logbooks.jlab.org/entry/3741413 Spare electronics] (Bill, Andrew) | ||
# [[Fall 2019 DIRC Commissioning|Fall 2019 Run Plan]] (All) | # [[Fall 2019 DIRC Commissioning|Fall 2019 Run Plan]] (All) |
Revision as of 07:23, 25 November 2019
Meeting Information
GlueX DIRC Meeting
Monday November 25, 2019
1:00 pm, EDT
Hall D Counting House
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Announcements:
- Installation complete!
- North OB water leak: initial rate, after 1 week, after 2 weeks
- North OB LED test: before water fill, after water fill
- South Mirror box: assembly and installation, potential mirror issues,
- South OB LED test: before water fill, after water fill
- Comparison of LED occupancy with and without water filled (Bill)
- FPGA temperatures in EPICS and now give an alarm if they exceed 60 C.
- DIRC moved to beam position
- Surveys are complete: initial values consistent with Spring 2019 surveys
- Readout/DAQ tests and issues (Justin, Bill, All)
- Missing pixel and appearance of dummy pixels
- Poor livetime when EPICs IOC is running at 100% CPU usage, crate controller CPU replaced (with 8 cores) problem resolved
- Missing module due to HV connector failure. Swapped to a spare connector and resolved
- Spare electronics (Bill, Andrew)
- Fall 2019 Run Plan (All)
- Spring 2019 DIRC Commissioning Analysis (All)
- Merged ROOT TTrees: /volatile/halld/home/jrsteven/RunPeriod-2019-01/recon/analysis_REST/ver01_pass00/merged/
- Existing simulation samples (10M events of ρ and φ samples): producing ROOT TTrees now with additional information on truth-level extrapolated tracks.
- /volatile/halld/home/gxproj7/dircsim-2019_01-ver00/gen_2pi/
- /volatile/halld/home/gxproj7/dircsim-2019_01-ver00/gen_2k/
- New simulation samples (100M events each): various job failures that Justin is still tracking down:
E*** Samples for both Spring 2019 (commissioning) and Fall 2019 (borosilicate mirrors) will be produced