Difference between revisions of "November 25, 2019 DIRC"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 36: | Line 36: | ||
#** The goal is to update those outside JLab about progress and coordinate analysis work. | #** The goal is to update those outside JLab about progress and coordinate analysis work. | ||
#* [https://logbooks.jlab.org/entry/3740903 GEM/TRD setup before installation] | #* [https://logbooks.jlab.org/entry/3740903 GEM/TRD setup before installation] | ||
− | #* Installed GEM/TRD position and plane labeling | + | #* [https://halldweb.jlab.org/wiki/images/7/71/GEMreadout.pdf Installed GEM/TRD position and plane labeling] |
# [[Spring 2019 DIRC Commissioning|Spring 2019 DIRC Commissioning Analysis]] (All) | # [[Spring 2019 DIRC Commissioning|Spring 2019 DIRC Commissioning Analysis]] (All) | ||
#* Merged ROOT TTrees: /volatile/halld/home/jrsteven/RunPeriod-2019-01/recon/analysis_REST/ver01_pass00/merged/ | #* Merged ROOT TTrees: /volatile/halld/home/jrsteven/RunPeriod-2019-01/recon/analysis_REST/ver01_pass00/merged/ |
Revision as of 13:51, 25 November 2019
Meeting Information
GlueX DIRC Meeting
Monday November 25, 2019
1:00 pm, EDT
Hall D Counting House
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Announcements:
- Installation complete!
- North OB water leak: initial rate, after 1 week, after 2 weeks
- North OB LED test: before water fill, after water fill
- South Mirror box: assembly and installation, potential mirror issues and remedies
- South OB LED test: before water fill, after water fill
- Comparison of LED occupancy with and without water filled (Bill)
- FPGA temperatures in EPICS and now give an alarm if they exceed 60 C.
- DIRC moved to beam position
- Surveys are complete: initial values consistent with Spring 2019 surveys
- Readout/DAQ tests and issues (Justin, Bill, All)
- Missing pixel and appearance of dummy pixels
- Poor livetime when EPICs IOC is running at 100% CPU usage, crate controller CPU replaced (with 8 cores) problem resolved
- Missing module due to HV connector failure. Swapped to a spare connector and resolved
- Max LV terminal output during pedestal calibration, further evaluation, and successful calibration run today
- Spare electronics (Bill, Andrew)
- Fall 2019 Run Plan (All)
- Plan for informal DIRC meetings at 10 am on Tuesday/Thursday during the run (Dec 3-19):
- The goal is to update those outside JLab about progress and coordinate analysis work.
- GEM/TRD setup before installation
- Installed GEM/TRD position and plane labeling
- Plan for informal DIRC meetings at 10 am on Tuesday/Thursday during the run (Dec 3-19):
- Spring 2019 DIRC Commissioning Analysis (All)
- Merged ROOT TTrees: /volatile/halld/home/jrsteven/RunPeriod-2019-01/recon/analysis_REST/ver01_pass00/merged/
- Existing simulation samples (10M events of ρ and φ samples): producing ROOT TTrees now with additional information on truth-level extrapolated tracks.
- /volatile/halld/home/gxproj7/dircsim-2019_01-ver00/gen_2pi/
- /volatile/halld/home/gxproj7/dircsim-2019_01-ver00/gen_2k/
- New simulation samples (100M events each): various job failures that Justin is still tracking down:
- Samples for both Spring 2019 (commissioning) and Fall 2019 (borosilicate mirrors) will be produced
- Commissioning LUT analyses (All)
- Cherenkov ring fit (Roman)
- Commissioning Analyses Update (Ahmed)
- Commissioning FastDIRC update (Yunjie)
- Software/simulations
- FastDIRC geometry implementation and alignment work (Cris/Yunjie)
- Software overview and tasks (All)
- AOB