Difference between revisions of "Engineering"
From GlueXWiki
(→HALL D MEDCON5 Resumption Status) |
(→HALL D MEDCON5 Resumption Status) |
||
Line 1: | Line 1: | ||
− | ==HALL D MEDCON5 Resumption | + | ==HALL D MEDCON5 Operations Resumption == |
+ | |||
+ | [[Hall D MEDCON5 Operations Resumption Status]] | ||
Files: | Files: |
Latest revision as of 07:21, 5 June 2020
HALL D MEDCON5 Operations Resumption
Hall D MEDCON5 Operations Resumption Status
Files:
- HOWTO Access Engineering Drawings at JLab
- Selected Civil Drawings OLD!
- hall_d_jt_assy_CABLES_ExtTess.jt
- Tagger interface drawing sheet 1
- Tagger interface drawing sheet 2
- Geometry showing detector locations
- File:Glue X Coil -1 Leak Check.xls.pdf
- Max cable lengths fo detectors
- Mechanical design task status
Machining Capabilities: