Difference between revisions of "October 12, 2020 DIRC"
From GlueXWiki
(Created page with "== Meeting Information == GlueX DIRC Meeting<br> Monday October 12, 2020<br> 1:00 pm, EDT<br> '''Remote only''' == Connection Using Bluejeans == # To join via Polycom room s...") |
(→Agenda) |
||
(2 intermediate revisions by 2 users not shown) | |||
Line 18: | Line 18: | ||
# Announcements: | # Announcements: | ||
#* Collaboration meeting Oct 22-24: DIRC performance update expected | #* Collaboration meeting Oct 22-24: DIRC performance update expected | ||
− | #* IEEE contribution by Yunjie: Virtual conference Oct 31 - Nov 7; 15-min + 3-min Q&A oral presentation on Nov 4 | + | #* IEEE contribution by Yunjie: Virtual conference Oct 31 - Nov 7; 15-min + 3-min Q&A oral presentation on Nov 4 at 9:48am; video-upload required 48 hrs before the session. |
# [https://halldweb.jlab.org/wiki/index.php/2020_Winter_-_2021_Spring Shutdown work planning] (Bill, All) | # [https://halldweb.jlab.org/wiki/index.php/2020_Winter_-_2021_Spring Shutdown work planning] (Bill, All) | ||
#* Survey/alignment planned for both bar boxes and optical boxes when crew is available (next week?) | #* Survey/alignment planned for both bar boxes and optical boxes when crew is available (next week?) | ||
Line 25: | Line 25: | ||
# DIRC commissioning analyses and 2020 studies (All) | # DIRC commissioning analyses and 2020 studies (All) | ||
#* Spring 2020 data production status (Justin) | #* Spring 2020 data production status (Justin) | ||
+ | #** Portion of runs 71350-71599 complete: /volatile/halld/home/gxproj7/RunPeriod-2019-11/recon/ver01_pass00/hd_root_71350_71598.root | ||
#* Geometric reconstruction update (Ahmed/Roman) | #* Geometric reconstruction update (Ahmed/Roman) | ||
#** [https://web-docs.gsi.de/~rdzhigad/www/research/delta-time-shift Update on shift of the time difference] | #** [https://web-docs.gsi.de/~rdzhigad/www/research/delta-time-shift Update on shift of the time difference] | ||
+ | #** [https://halldweb.jlab.org/wiki/images/f/fa/PerPMTCorrection.pdf Per PMT Correction] | ||
#* FastDIRC update (Yunjie) | #* FastDIRC update (Yunjie) | ||
# [https://halldweb.jlab.org/wiki/index.php/April_20-21,_2020_DIRC#Action_items Follow-up on additional action items from workfest] (All) | # [https://halldweb.jlab.org/wiki/index.php/April_20-21,_2020_DIRC#Action_items Follow-up on additional action items from workfest] (All) |
Latest revision as of 13:11, 12 October 2020
Meeting Information
GlueX DIRC Meeting
Monday October 12, 2020
1:00 pm, EDT
Remote only
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Announcements:
- Collaboration meeting Oct 22-24: DIRC performance update expected
- IEEE contribution by Yunjie: Virtual conference Oct 31 - Nov 7; 15-min + 3-min Q&A oral presentation on Nov 4 at 9:48am; video-upload required 48 hrs before the session.
- Shutdown work planning (Bill, All)
- Survey/alignment planned for both bar boxes and optical boxes when crew is available (next week?)
- Followed by opening optical boxes and inspecting mirrors, etc.
- Hall D Engineering Page: current detailed https://www.jlab.org/Hall-D/engineering/Hall%20D%20SAD%202020v2.pdf schedule]
- DIRC commissioning analyses and 2020 studies (All)
- Spring 2020 data production status (Justin)
- Portion of runs 71350-71599 complete: /volatile/halld/home/gxproj7/RunPeriod-2019-11/recon/ver01_pass00/hd_root_71350_71598.root
- Geometric reconstruction update (Ahmed/Roman)
- FastDIRC update (Yunjie)
- Spring 2020 data production status (Justin)
- Follow-up on additional action items from workfest (All)
- 100M event MC samples required for ρ and φ data/MC comparisons:
- /volatile/halld/home/gxproj7/RunPeriod-2019-11/dircsim-2019_11-ver02/analysis/hd_root_gen_2pi_pass00.root
- /volatile/halld/home/gxproj7/RunPeriod-2019-11/dircsim-2019_11-ver02/analysis/hd_root_gen_2k_pass00.root
- 100M event MC samples required for ρ and φ data/MC comparisons:
- AOB