Difference between revisions of "March 25, 2021 CPP Design Meeting"
From GlueXWiki
(Created page with "== Meeting Time and Place == Thursday March 25, 2021, 2pm Bluejeans https://bluejeans.com/465620466 * Present - Elton, Dave, Stephanie, Ilya, Rory, Mark S, Beni, Simon, Mark...") |
(→Minutes and Action Items) |
||
(4 intermediate revisions by the same user not shown) | |||
Line 10: | Line 10: | ||
** [[Media:CPP_ERR_Report.pdf]] | ** [[Media:CPP_ERR_Report.pdf]] | ||
** [[CPP and NPP Readiness Review]] | ** [[CPP and NPP Readiness Review]] | ||
+ | * Lead Configuration | ||
+ | ** [[Media:Lead_joints.pdf]] | ||
+ | ** [[Media:Lead_joint_side.pdf]] | ||
* MWPC Issues | * MWPC Issues | ||
** [[Media:MWPC_issues.pdf]] | ** [[Media:MWPC_issues.pdf]] | ||
Line 15: | Line 18: | ||
** [[Media:Microscope_Move.pdf]] | ** [[Media:Microscope_Move.pdf]] | ||
** [[Media:Microscope_Location.pdf]] | ** [[Media:Microscope_Location.pdf]] | ||
− | * Design/Procurement status | + | * Design/Fab/Procurement status |
** Stand | ** Stand | ||
** Steel | ** Steel | ||
+ | ** Fcal platform mods | ||
* Things to work out | * Things to work out | ||
** Gas line manifold/bubblers (Beni has some) | ** Gas line manifold/bubblers (Beni has some) | ||
Line 29: | Line 33: | ||
== Minutes and Action Items == | == Minutes and Action Items == | ||
+ | * James to make parts for Microscope new location by end of June | ||
+ | * Tim to re-measure distance Microscope can move DS | ||
+ | * Ilya stated that the 45° joint in the lead absorber is not an issue. He will have a closer look at the 90° joints | ||
+ | * Need to machine the steel on the 90° joints of the lead absorber so there are no gaps | ||
+ | * Tim (Stephanie)to send Beni US moveable lead shield configuration | ||
+ | * Move meeting to 3:30 and add Beni |
Latest revision as of 08:54, 8 April 2021
Meeting Time and Place
Thursday March 25, 2021, 2pm Bluejeans https://bluejeans.com/465620466
- Present - Elton, Dave, Stephanie, Ilya, Rory, Mark S, Beni, Simon, Mark I
Agenda
- Minutes from last meeting https://halldweb.jlab.org/wiki/index.php/February_25,_2021_CPP_Design_Meeting/ERR_discussion
- Readiness Review Report
- Lead Configuration
- MWPC Issues
- Microscope move
- Design/Fab/Procurement status
- Stand
- Steel
- Fcal platform mods
- Things to work out
- Gas line manifold/bubblers (Beni has some)
- Complete structural analysis
- Develop Detailed installation plan
- Develop Design/operational/Maintenance Requirements
- Modified US vacuum system
- Solid target installation
- Documentation for ERR
- Microscope move
Minutes and Action Items
- James to make parts for Microscope new location by end of June
- Tim to re-measure distance Microscope can move DS
- Ilya stated that the 45° joint in the lead absorber is not an issue. He will have a closer look at the 90° joints
- Need to machine the steel on the 90° joints of the lead absorber so there are no gaps
- Tim (Stephanie)to send Beni US moveable lead shield configuration
- Move meeting to 3:30 and add Beni