Difference between revisions of "Nov 10, 2008 Calorimetry"
From GlueXWiki
m (Text replacement - "http://argus.phys.uregina.ca/cgi-bin/private" to "https://halldweb.jlab.org/doc-private") |
|||
(5 intermediate revisions by one other user not shown) | |||
Line 8: | Line 8: | ||
=Items for followup from Oct 27 meeting= | =Items for followup from Oct 27 meeting= | ||
− | # | + | # Updates on [[Sep 2, 2008 Calorimetry#Calibration Specifications Table | Calibration Specification Table]]. |
− | + | ||
# Resolution studies (Blake) | # Resolution studies (Blake) | ||
#* Develop criteria for evaluating resolution studies | #* Develop criteria for evaluating resolution studies | ||
− | #* | + | #* Study impact of inactive material at the end of Bcal on acceptance. |
− | + | ||
− | + | ||
− | + | ||
− | + | ||
# Add F100 rad hard glass to simulation. - New graduate student has been assigned this project. | # Add F100 rad hard glass to simulation. - New graduate student has been assigned this project. | ||
# [[BCAL#Roadmap_toward_a_decision_for_Bcal_Readout | Add roadmap for Bcal Roadmap to wiki]] (Elton) | # [[BCAL#Roadmap_toward_a_decision_for_Bcal_Readout | Add roadmap for Bcal Roadmap to wiki]] (Elton) | ||
+ | # Check what configuration (thresholds, step sizes, stack? parameters for secondaries, etc) is being used for the Hall D simulations (Regina) | ||
+ | # Updated schedule with new Fcal procurement dates. (Elke will send this to Matt) | ||
+ | # Report on the Bfield components in the region of the Bcal reaout (JLab for next meeting). | ||
+ | # Updated drawings of Bcal modules (including O-ring) for discussions. Tim will see if that can be fitted into designer tasks. | ||
= Documents to Review= | = Documents to Review= | ||
− | # | + | # For components of the magnetic fields see [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=912 GlueX-doc-912], Figures 9 and 11. |
+ | |||
= Tentative Agenda = | = Tentative Agenda = | ||
Line 31: | Line 31: | ||
# Bcal | # Bcal | ||
## [[BCAL#Roadmap_toward_a_decision_for_Bcal_Readout| Bcal readout]] | ## [[BCAL#Roadmap_toward_a_decision_for_Bcal_Readout| Bcal readout]] | ||
+ | ## Readout | ||
##* Review of use of APDs for readout? (Serguei) | ##* Review of use of APDs for readout? (Serguei) | ||
− | ## | + | ## Resolution studies |
− | + | ## Bcal Construction MOUs | |
− | ## Bcal Construction | + | ##* [[Oct 15, 2008 Calorimetry | Visit to Alberta Oct 15]] |
− | ##* [[Oct 15, 2008 Calorimetry | Visit to Alberta]] | + | |
=Minutes= | =Minutes= | ||
Attending: | Attending: |
Latest revision as of 17:12, 24 February 2017
NEW TIME Time: 11:15 ET.
- Phone:
- +1-800-377-8846 : US
- +1-888-276-7715 : Canada
- +1-302-709-8424 : International
- then enter participant code: 39527048# (remember the "#")
Contents
Items for followup from Oct 27 meeting
- Updates on Calibration Specification Table.
- Resolution studies (Blake)
- Develop criteria for evaluating resolution studies
- Study impact of inactive material at the end of Bcal on acceptance.
- Add F100 rad hard glass to simulation. - New graduate student has been assigned this project.
- Add roadmap for Bcal Roadmap to wiki (Elton)
- Check what configuration (thresholds, step sizes, stack? parameters for secondaries, etc) is being used for the Hall D simulations (Regina)
- Updated schedule with new Fcal procurement dates. (Elke will send this to Matt)
- Report on the Bfield components in the region of the Bcal reaout (JLab for next meeting).
- Updated drawings of Bcal modules (including O-ring) for discussions. Tim will see if that can be fitted into designer tasks.
Documents to Review
- For components of the magnetic fields see GlueX-doc-912, Figures 9 and 11.
Tentative Agenda
- Announcements
- Calibration
- Progress on filling in the Calibration Specification Table.
- Fcal
- Report of timing studies with pmts and time calibration (Jake Bennet)
- Bcal
- Bcal readout
- Readout
- Review of use of APDs for readout? (Serguei)
- Resolution studies
- Bcal Construction MOUs
Minutes
Attending: