Difference between revisions of "Run Planning Meeting Notes, November 18 - November 24, 2021"
From GlueXWiki
(→Monday, November 22) |
(→Wednesday, November 24) |
||
(17 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
+ | =Wednesday, November 24= | ||
+ | #Last 24h: | ||
+ | #* Took ~0.8B triggers on full LD2 target + ~78M triggers on empty target ([https://logbooks.jlab.org/entry/3948794 some DAQ plots] | ||
+ | |||
+ | #Issues: | ||
+ | #* None | ||
+ | #Plan: | ||
+ | #* Target change to carbon and reestablish running conditions for production on carbon | ||
+ | #Analysis update | ||
+ | |||
+ | =Tuesday, November 23= | ||
+ | #Last 24h: | ||
+ | #* Took ~0.8B triggers on LD2 before solenoid dump + ~1.4B after | ||
+ | #* Took some PS background data with TPOL converter retracted while solenoid was ramping | ||
+ | #Issues: | ||
+ | #* Solenoid dump at 11:30 am | ||
+ | #** Traced to defective Convectron panel meter [https://logbooks.jlab.org/entry/3948244] | ||
+ | #** Started ramp back up at 14:33, finished ramp at 23:04 | ||
+ | #* RCDB web interface froze again at about midnight | ||
+ | #Plan: | ||
+ | #* Continue production at 140 nA on diamond | ||
+ | #* Switch to empty target during the day in preparation for target change on Wednesday | ||
+ | #* Ramp down solenoid at midnight Wednesday morning | ||
+ | # Analysis update | ||
+ | |||
=Monday, November 22= | =Monday, November 22= | ||
#Last 72h: | #Last 72h: | ||
− | #* Recorded ~ | + | #* Recorded ~2.5B triggers on LHe |
+ | #** Took some data (~100M) with COMCAL inserted into the beam: [https://logbooks.jlab.org/entry/3947216 Trigger/DAQ/Data rates] | ||
+ | #** Took ~39M (production) triggers on LHe at 50 nA: [https://logbooks.jlab.org/entry/3947226 Trigger/DAQ/Data rates] | ||
+ | #** Took ~33M triggers on LHe empty target: [https://logbooks.jlab.org/entry/3947340 Trigger/DAQ/Data rates] | ||
#* Switched to Liquid deuterium during swing shift on Saturday: [https://logbooks.jlab.org/entry/3947358 Target cooling] | #* Switched to Liquid deuterium during swing shift on Saturday: [https://logbooks.jlab.org/entry/3947358 Target cooling] | ||
− | #** [https://logbooks.jlab.org/entry/3947422 Trigger/DAQ/Data | + | #** [https://logbooks.jlab.org/entry/3947422 Trigger/DAQ/Data rates at 140 nA]: 68 kHz w/ 96% live time |
− | + | #** Took ~5B triggers (192M AMO): [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2021-11/index.html] | |
#Issues: | #Issues: | ||
+ | #* Saturday: [https://logbooks.jlab.org/entry/3947097 5C11 Y drift/beam energy drift] | ||
+ | #* Sunday:[https://logbooks.jlab.org/entry/3947488 AC x,y lock positions had x<->y interchanged, now X=0.0 and Y=-0.1] | ||
+ | #* [https://logbooks.jlab.org/entry/3947881 RCDB web interface freezing at midnight ?] | ||
+ | #* [https://logbooks.jlab.org/entry/3947958 BCAL humidity levels high in upstream modules] | ||
#Plan: | #Plan: | ||
#* Continue production at 140 nA on diamond | #* Continue production at 140 nA on diamond |
Latest revision as of 07:59, 24 November 2021
Contents
Wednesday, November 24
- Last 24h:
- Took ~0.8B triggers on full LD2 target + ~78M triggers on empty target (some DAQ plots
- Issues:
- None
- Plan:
- Target change to carbon and reestablish running conditions for production on carbon
- Analysis update
Tuesday, November 23
- Last 24h:
- Took ~0.8B triggers on LD2 before solenoid dump + ~1.4B after
- Took some PS background data with TPOL converter retracted while solenoid was ramping
- Issues:
- Solenoid dump at 11:30 am
- Traced to defective Convectron panel meter [1]
- Started ramp back up at 14:33, finished ramp at 23:04
- RCDB web interface froze again at about midnight
- Solenoid dump at 11:30 am
- Plan:
- Continue production at 140 nA on diamond
- Switch to empty target during the day in preparation for target change on Wednesday
- Ramp down solenoid at midnight Wednesday morning
- Analysis update
Monday, November 22
- Last 72h:
- Recorded ~2.5B triggers on LHe
- Took some data (~100M) with COMCAL inserted into the beam: Trigger/DAQ/Data rates
- Took ~39M (production) triggers on LHe at 50 nA: Trigger/DAQ/Data rates
- Took ~33M triggers on LHe empty target: Trigger/DAQ/Data rates
- Switched to Liquid deuterium during swing shift on Saturday: Target cooling
- Trigger/DAQ/Data rates at 140 nA: 68 kHz w/ 96% live time
- Took ~5B triggers (192M AMO): [2]
- Recorded ~2.5B triggers on LHe
- Issues:
- Plan:
- Continue production at 140 nA on diamond
- Analysis update
Friday, November 19
- Last 24h:
- Repair work for RF separator did not end up impacting taking beam -- yay!
- Added ~2B triggers: [3]
- Issues:
- A couple of minor issues:
- DAQ computer acting weird, but this did not impact actual data taking
- Alcohol bubbler too dark to see: [4]
- A couple of minor issues:
- Plan:
- Continue production at 150nA on diamond
- Saturday day: Low current + empty target?
- Saturday swing: switch to liquid deuterium
- Analysis update
Thursday November 18
- Last 24h:
- ~1.4 B triggers (250M AMO): [5]
- Down from ~8:45 am -> 9:30 pm due to 4th pass RF separator problem
- Repair plan: down at ~10 am for ~30 minutes, then acc will decide if full system needs to be down for repair for longer time
- Some discussion regarding using magnetic separation for 1 hall running if down more than 30 minutes
- Issues:
- writing on tape?
- High temperature of locked-up FCAL bases? [6]
- Shift crew will take over servicing FCAL base lock ups. wiki instructions
- Plan:
- Continue production at 150nA on diamond
- Analysis update