Difference between revisions of "April 07, 2022 CPP Design/Install Meeting"
From GlueXWiki
(→Agenda) |
|||
(10 intermediate revisions by the same user not shown) | |||
Line 17: | Line 17: | ||
** Cabling | ** Cabling | ||
** Microscope | ** Microscope | ||
− | ** Hodoscope [[image: | + | ** Hodoscope - plate #7 installed - 5-6mm high [[image:hodo7.png|thumb]] |
** Target - fiducialization [[image:Target1.jpg|thumb]] | ** Target - fiducialization [[image:Target1.jpg|thumb]] | ||
** Vacuum | ** Vacuum | ||
Line 24: | Line 24: | ||
** need many cables - should limit X motion | ** need many cables - should limit X motion | ||
** Air cooled | ** Air cooled | ||
− | ** supported on TAC base plate | + | ** supported on TAC base plate [[Media:CPP_TAC.pdf]] |
− | * | + | * Adjustable Lead - what is the plan for usage? [[image:Adj_Lead.png|thumb]] |
− | * Helium Bag inside CDC | + | * Helium Bag inside CDC [[Media:Hebag.jpg]] |
+ | |||
+ | == Minutes == | ||
+ | * Decided an OSP is needed since this is not baseline equipment. Still keep in ESAD - Elton | ||
+ | * Rory requested practice for moving adjustable lead absorber - | ||
+ | ** Tim to write procedure | ||
+ | ** Should only need to move early in calibration mode | ||
+ | ** Tim will talk to Dave Hamlette about being able to adjust the lead without Radcon present | ||
+ | * Six signal cables are in house and being tested | ||
+ | * Target and helium bag | ||
+ | ** Simon and Beni would like the geometry of the target/thin windows and helium bag layout | ||
+ | ** OK to proceed with helium bag design with PVC plastic tube at upstream end |
Latest revision as of 13:34, 21 April 2022
Meeting Time and Place
Thursday April 07, 2022, 3:00pm
Zoom Meeting
https://jlab-org.zoomgov.com/j/1602846419?pwd=YTNEeXI3aHBKSERjMGpsTVJZd25sQT09&from=addon
Meeting ID: 160 284 6419 Passcode: 459361
- Invited - Elton, Dave, Stephanie, Ilya, Rory, Mark S, Beni, Simon, Mark I, Anthony, Alex S., Eugene
Agenda
- Minutes from last meeting https://halldweb.jlab.org/wiki/index.php/March_24,_2022_CPP_Design/Install_Meeting#Minutes
- Installation Status
- Detector installed, paddles installed
- Cabling
- Microscope
- Hodoscope - plate #7 installed - 5-6mm high
- Target - fiducialization
- Vacuum
- Gas
- 3x3 Crystal TAC - Bobby working with Sasha
- need many cables - should limit X motion
- Air cooled
- supported on TAC base plate Media:CPP_TAC.pdf
- Adjustable Lead - what is the plan for usage?
- Helium Bag inside CDC Media:Hebag.jpg
Minutes
- Decided an OSP is needed since this is not baseline equipment. Still keep in ESAD - Elton
- Rory requested practice for moving adjustable lead absorber -
- Tim to write procedure
- Should only need to move early in calibration mode
- Tim will talk to Dave Hamlette about being able to adjust the lead without Radcon present
- Six signal cables are in house and being tested
- Target and helium bag
- Simon and Beni would like the geometry of the target/thin windows and helium bag layout
- OK to proceed with helium bag design with PVC plastic tube at upstream end