Difference between revisions of "October 21, 2022 Tech group meeting"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 18: | Line 18: | ||
** Remove ComCal? | ** Remove ComCal? | ||
** Install GEM? | ** Install GEM? | ||
− | ** BCAL chiller swap | + | ** BCAL/FDC chiller swap |
* Hall D current Tasks | * Hall D current Tasks | ||
** FCAL Insert Module fabrication | ** FCAL Insert Module fabrication |
Latest revision as of 10:11, 21 October 2022
Meeting Time and Place =
Friday October 21, 2022 9:30am TED 2559 and Teams
Agenda
- Safety - Scissor Lift Cats item
- Medcon Level changes
- Capacitors
- Toe safety
- All appraisals completed by Thanksgiving!
- Physics all hands meeting December 6
- January Schedule 3rd-14th
- Get DIRC operational
- Install new .o25 orifice
- Modify Tagger Microscope
- Install New Profiler
- Remove ComCal?
- Install GEM?
- BCAL/FDC chiller swap
- Get DIRC operational
- Hall D current Tasks
- FCAL Insert Module fabrication
- brass straps
- matching mu metal to steel shields - 200 more to go
- FCAL2 Design tidbits
- Monitoring panel discussion - Stephanie
- need cooling pipe to chiller assy
- need dark room mod for electronic patch panels, need to complete 0200 final assy dwg
- need installation drawing
- insert plexiglass, outer plexiglass
- Tungsten
- Insulation
- Scaffolding on temporary platform
- Electronic patch panels
- Liftable frame mods
- Cable trays
- FCAL2 Assembly
- Assemble FCAL2 step plates/cooling blocks -
- Epoxy fittings to Cooling Manifold
- Weld water manifold supports
- Bend/solder copper tubes - complete?
- Epoxy fittings to tubes
- JBweld conductive epoxy tubes to blocks
- HDList updates
- KLONG dwgs
- FCAL Insert Module fabrication
- Controls - Bobbly will be responsible for PLC
- General Maintenance
- On Call -
- ePAS Training and trial https://www.jlab.org/esh/epas