+ | =Wednesday, November 2= | ||
+ | === Past 24 hours === | ||
+ | * Production running on full target until 8 am, start of maintenance day | ||
+ | |||
+ | === Shift Summary === | ||
+ | * [https://logbooks.jlab.org/entry/4074626 Day Nov 1] | ||
+ | * [https://logbooks.jlab.org/entry/4074807 Swing Nov 1] | ||
+ | * [https://logbooks.jlab.org/entry/4074935 Owl Nov1/2] | ||
+ | * [https://logbooks.jlab.org/entry/4075125 Early riser Nov 2] | ||
+ | |||
+ | === Issues/Reports === | ||
+ | * [https://logbooks.jlab.org/entry/4075099 FCAL voltage issue] (Alison) | ||
+ | * [https://logbooks.jlab.org/entry/4075204 Hole in reconstructed Compton position in FCAL] (Ahmed) | ||
+ | |||
+ | === Plan === | ||
+ | * Today: Hall A pass change and accelerator maintenance day | ||
+ | ** Beam off at 8 am and plan to return before 4 pm | ||
+ | * Harp scans after beam returns | ||
+ | * 2 hours full target production | ||
+ | * Empty target, then start production | ||
+ | * After empty production completed: calibration of CompCal modules with adjusted HV, 1 hr at low intensity (Sasha) | ||
+ | * Olga Cortes Becerra taking over as RC later today | ||
=Tuesday, November 1= | =Tuesday, November 1= | ||
=== Past 24 hours === | === Past 24 hours === | ||
+ | * Production running on full target | ||
=== Shift Summary === | === Shift Summary === | ||
+ | * [https://logbooks.jlab.org/entry/4073966 Day Oct 31] | ||
+ | * [https://logbooks.jlab.org/entry/4074221 Swing Oct 31] | ||
+ | * [https://logbooks.jlab.org/entry/4074381 Owl Oct 31/Nov1] | ||
+ | * [https://logbooks.jlab.org/entry/4074502 Early riser Nov 1] | ||
=== Issues/Reports === | === Issues/Reports === | ||
+ | * FCAL channels: [https://logbooks.jlab.org/entry/4074053 one base not responsive] and [https://logbooks.jlab.org/entry/4074479 another fluctuating voltage] -- Mark | ||
=== Plan === | === Plan === | ||
− | * | + | * Continued production running on full target |
− | * | + | * Wednesday: Hall A pass change and maintenance day (access) |
− | * | + | *# Harp scans after beam returns |
+ | *# 2 hours full target production | ||
+ | *# Empty target, then start production | ||
+ | * After empty production completed: | ||
+ | ** Calibration of CompCal modules with adjusted HV, 1 hr at low intensity | ||
=Monday, October 31= | =Monday, October 31= |
Latest revision as of 08:40, 2 November 2022
Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)
Hall D counting room white board
Back to Run Coordination Meetings:Fall2022
Contents
Wednesday, November 2
Past 24 hours
- Production running on full target until 8 am, start of maintenance day
Shift Summary
Issues/Reports
- FCAL voltage issue (Alison)
- Hole in reconstructed Compton position in FCAL (Ahmed)
Plan
- Today: Hall A pass change and accelerator maintenance day
- Beam off at 8 am and plan to return before 4 pm
- Harp scans after beam returns
- 2 hours full target production
- Empty target, then start production
- After empty production completed: calibration of CompCal modules with adjusted HV, 1 hr at low intensity (Sasha)
- Olga Cortes Becerra taking over as RC later today
Tuesday, November 1
Past 24 hours
- Production running on full target
Shift Summary
Issues/Reports
- FCAL channels: one base not responsive and another fluctuating voltage -- Mark
Plan
- Continued production running on full target
- Wednesday: Hall A pass change and maintenance day (access)
- Harp scans after beam returns
- 2 hours full target production
- Empty target, then start production
- After empty production completed:
- Calibration of CompCal modules with adjusted HV, 1 hr at low intensity
Monday, October 31
Happy Halloween!
Past 72 hours
- Friday afternoon TOF HV module failed, replaced (Beni/Sasha)
- Beam returned early Saturday morning and was smooth most of the weekend
Shift Summary
- Day Oct 28
- Swing Oct 28
- Owl Oct 28/29
- Early Riser Oct 29
- Day Oct 29
- Swing Oct 29
- Owl Oct 29/30
- Early Riser Oct 30
- Day Oct 30
- Swing Oct 30
- Owl Oct 30/31
- Early Riser Oct 31
Issues/Reports
- FDC translation table needs update for PrimEx (Justin/Lubomir)
Plan
- Production running on full target until Monday afternoon or Tuesday morning
- Request for raw mode running with beam (none for PrimEx yet) -- Monday after Sasha confirms configuration file
- Calibration of CompCal modules with adjusted HV, 1 hr at low intensity -- postponed to Thursday (after maintenance)
- Accelerator: Hall A pass change and maintenance day (access) on Wednesday this week
Friday, October 28
Past 24 hours
- Returned from RF recovery around 6 pm, postponed CompCal calibration run to Friday
- Harp scans performed when beam restored
- Production running until midnight: "smoking gun" for burnt RF power supply
- FDC chiller interlock
Shift Summary
Issues/Reports
Plan
- Recover from accelerator power supply issue by "early afternoon"
- Calibration of CompCal modules with adjusted HV, 1 hr at low intensity (Sasha)
- Production data with full target
Thursday, October 27
Past 24 hours
- Smooth running with empty target
- 6 CDC Pressure alarms: new run started each time, last one required DAQ crate reboot (delayed restart)
Shift Summary
Issues/Reports
- Avoid long prestarts (Naomi)
- 32 ns shift in tagger crate (no action required)
- Do we still want beam strip charts in the logbook every 2 hours (as noted on white board)?
- SC Dark Current/Rates (Beni)
Plan
- RF recovery for 4 hours this morning, starting at 8 am: target testing, Kondo GEM work, mechanical checks for FCAL-II work
- Expect to start beam recovery around noon
- Fill target before beam returns for production data
- Harp scan after beam is restored, more than a week since the last one (Alexandre)
- Calibration of CompCal modules with adjusted HV, 1 hr at low intensity (Sasha)
- Production data with full target