Line 20: | Line 20: | ||
** Air compressor relief test | ** Air compressor relief test | ||
** Goniometer run through axis | ** Goniometer run through axis | ||
+ | ** Target mod for hydrogen | ||
* Hall D current Tasks | * Hall D current Tasks | ||
** FCAL Insert Module fabrication | ** FCAL Insert Module fabrication | ||
Line 37: | Line 38: | ||
*** Cable trays | *** Cable trays | ||
*** drip pan | *** drip pan | ||
+ | ** BCAL platform and manlift? | ||
** FCAL2 Assembly | ** FCAL2 Assembly | ||
*** Assemble FCAL2 step plates/cooling blocks - S&A completed on lower half | *** Assemble FCAL2 step plates/cooling blocks - S&A completed on lower half |
Latest revision as of 15:44, 15 November 2022
Meeting Time and Place =
Friday November 04, 2022 9:30am TED 2559 and Teams
Agenda
- Safety - HDList
- All self assessments complete, Thanks! supervisors to complete by Thanksgiving!
- Update Individual Career Profile
- Physics all hands meeting December 6
- January Schedule 3rd-14th
- Get DIRC operational
- Install new .o25 orifice
- Fill optical boxes
- Modify Tagger Microscope
- Install New Profiler
- Remove ComCal - yes
- Install GEM
- BCAL/FDC chiller swap
- Air compressor relief test
- Goniometer run through axis
- Target mod for hydrogen
- Get DIRC operational
- Hall D current Tasks
- FCAL Insert Module fabrication
- brass straps
- matching mu metal to steel shields - 200 more to go
- FCAL2 Design tidbits
- Monitoring panel discussion - Stephanie
- need cooling pipe to chiller assy
- need dark room mod for electronic patch panels, need to complete 0200 final assy dwg
- need installation drawing
- insert plexiglass, outer plexiglass
- Tungsten
- Insulation
- Scaffolding on temporary platform?
- Electronic patch panels
- Liftable frame mods
- Cable trays
- drip pan
- BCAL platform and manlift?
- FCAL2 Assembly
- Assemble FCAL2 step plates/cooling blocks - S&A completed on lower half
- Epoxy fittings to Cooling Manifold
- Weld water manifold supports
- Bend/solder copper tubes - complete
- Epoxy fittings to tubes and leak check
- JBweld conductive epoxy tubes to blocks
- HDList updates - weekly!
- KLONG dwgs
- FCAL Insert Module fabrication
- Controls - Bobby is responsible for PLC - training next week
- General Maintenance
- On Call -
- ePAS Training and trial https://www.jlab.org/esh/epas