+ | = Wednesday February 22 = | ||
+ | |||
+ | === Past 24 hours === | ||
+ | * Production runs. Several cosmic runs were taken during downtimes. | ||
+ | |||
+ | === Shift Reports === | ||
+ | * [https://logbooks.jlab.org/entry/4136448 0400-1000] | ||
+ | * [https://logbooks.jlab.org/entry/4136217 2200-0400] | ||
+ | * [https://logbooks.jlab.org/entry/4135998 1600-2200] | ||
+ | * [https://logbooks.jlab.org/entry/4135812 1000-1600] | ||
+ | * [https://logbooks.jlab.org/entry/4135672 0600-1000] | ||
+ | |||
+ | === Reports === | ||
+ | * [https://logbooks.jlab.org/entry/4135840 Follow-up Re: IBC0L02 calibration to FC2] (Alexandre) | ||
+ | * [https://logbooks.jlab.org/entry/4135883 Hall D Target compressor cooling water] (Tim) | ||
+ | * [https://logbooks.jlab.org/entry/4136018 ISEG modules swapped] (Mark) | ||
+ | * [https://logbooks.jlab.org/entry/4136001 TAGM wave forms] (Beni) | ||
+ | * [https://logbooks.jlab.org/entry/4136129 MPOD installed on CCAL test setup] (Sasha) | ||
+ | * [https://logbooks.jlab.org/entry/4136455 brief grafana error] (Simon) | ||
+ | * [https://logbooks.jlab.org/entry/4136518 Tagger NMR] (Scot) | ||
+ | * [https://logbooks.jlab.org/entry/4136530 FDC CDC gas pressure alarm PT501] | ||
+ | * Statistics balance | ||
+ | **PARA 0/90: 21.0% | ||
+ | **PERP 0/90: 20.5% | ||
+ | **PARA 45/135: 21.4% | ||
+ | **PERP 45/135: 20.6% | ||
+ | **AMO : 16.5% | ||
+ | |||
+ | === Issues === | ||
+ | Pending: | ||
+ | * [https://logbooks.jlab.org/entry/4117764 Start Counter (Beni)] - We do not understand why there is a mismatch in the software between start counter and tracking. | ||
+ | * [https://logbooks.jlab.org/entry/4133378 TAGH hot channels w/ no beam] | ||
+ | ** Hovanes rebooted the crate but it didn't help. | ||
+ | ** Sasha explains the problematic channel(s) are deteriorated and this is not an issue which can be easily fixed. | ||
+ | * [https://logbooks.jlab.org/entry/4133666 Noise in FDC2] (Lubomir) | ||
+ | * [https://logbooks.jlab.org/entry/4133998 FCAL11 crate problems] (Sergey) | ||
+ | ** Network port on the fan tray for FCAL11 crate is not working. When we have an expected long downtime, this tray should be replaced (Chris Stanislav). | ||
+ | |||
+ | === Plans === | ||
+ | * Install CCAL whenever there is an extended accelerator downtime | ||
+ | ** Restricted Access is needed to be able to use the ramp <-done | ||
+ | ** Cabling | ||
+ | ** Survey is needed | ||
+ | * Production (300 nA, 2h runs) with cycle: | ||
+ | **2 runs PARA (0/90) | ||
+ | **2 runs PERP (0/90) | ||
+ | **2 runs PARA (45/135) | ||
+ | **2 runs PERP (45/135) | ||
+ | **1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI) | ||
+ | |||
+ | = Tuesday February 21 = | ||
+ | |||
+ | === Past 24 hours === | ||
+ | * BCM Calibration executed. MCC decided no recalibration was needed. | ||
+ | * Production runs resumed after beam came back. | ||
+ | |||
+ | === Shift Reports === | ||
+ | * [https://logbooks.jlab.org/entry/4135672 0600-1000] | ||
+ | * [https://logbooks.jlab.org/entry/4135612 0400-0600] | ||
+ | * [https://logbooks.jlab.org/entry/4135462 2200-0400] | ||
+ | * [https://logbooks.jlab.org/entry/4135276 1600-2200] | ||
+ | * [https://logbooks.jlab.org/entry/4135189 1000-1600] | ||
+ | * [https://logbooks.jlab.org/entry/4134981 0400-1000] | ||
+ | |||
+ | === Reports === | ||
+ | * [https://logbooks.jlab.org/entry/4135208 Hall D NMR Meter - Installed] (Scot) | ||
+ | ** MCC stopped beam delivery after NMR IOC communication loss (just a monitor device) was detected. | ||
+ | ** (In RC meeting) They say they are not expert in Hall equipment and they will stop the beam delivery when whatever crew chief does not know happens. | ||
+ | * [https://logbooks.jlab.org/entry/4135236 BCM calibration] | ||
+ | ** MCC called shift crews to ask what the maximum calibration current should be. | ||
+ | ** (In RC meeting) They say this is on us (Hall D), so we should prepare this value beforehand in the future BCM calibration work. | ||
+ | * [https://logbooks.jlab.org/entry/4135353 Harp scan after BCM work] | ||
+ | * [https://logbooks.jlab.org/entry/4135733 Harp scan after the long midnight downtime] | ||
+ | * [https://logbooks.jlab.org/entry/4135463 BCAL ISEG modules swapped during a long downtime] (Mark) | ||
+ | ** [https://logbooks.jlab.org/entry/4135758 BCAL voltage instability gone] | ||
+ | * Took BCAL cosmic run (R120783 and more) during the calibration work (and during midnight downtime). | ||
+ | * Early-riser shift leader felt unwell and Keigo (RC) took over. We need a volunteer for tomorrow morning shift. | ||
+ | * Statistics balance | ||
+ | **PARA 0/90: 21.0% | ||
+ | **PERP 0/90: 20.5% | ||
+ | **PARA 45/135: 21.4% | ||
+ | **PERP 45/135: 20.6% | ||
+ | **AMO : 16.5% | ||
+ | |||
+ | === Issues === | ||
+ | Pending: | ||
+ | * [https://logbooks.jlab.org/entry/4117764 Start Counter (Beni)] - We do not understand why there is a mismatch in the software between start counter and tracking. | ||
+ | * [https://logbooks.jlab.org/entry/4133378 TAGH hot channels w/ no beam] | ||
+ | * [https://logbooks.jlab.org/entry/4133666 Noise in FDC2] (Lubomir) | ||
+ | * [https://logbooks.jlab.org/entry/4133998 FCAL11 crate problems] (Sergey) | ||
+ | * [https://logbooks.jlab.org/entry/4133226 Temperature rise of target compressor cooling water] (Tim) | ||
+ | |||
+ | === Plans === | ||
+ | * Install CCAL whenever there is an extended accelerator downtime | ||
+ | ** Restricted Access is needed to be able to use the ramp <-done | ||
+ | ** Cabling | ||
+ | ** Survey is needed | ||
+ | * Production (300 nA, 2h runs) with cycle: | ||
+ | **2 runs PARA (0/90) | ||
+ | **2 runs PERP (0/90) | ||
+ | **2 runs PARA (45/135) | ||
+ | **2 runs PERP (45/135) | ||
+ | **1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI) | ||
+ | |||
+ | = Monday February 20 = | ||
+ | === Past 72 hours === | ||
+ | * Production runs. ABU = 35.5 h for the weekend. (12.7 h Friday, 13.8 h Saturday, 9.0 h Sunday) | ||
+ | |||
+ | === Shift Reports Friday=== | ||
+ | * [https://logbooks.jlab.org/entry/4133204 Day shift summary] | ||
+ | * [https://logbooks.jlab.org/entry/4133443 Swing shift summary] | ||
+ | * [https://logbooks.jlab.org/entry/4133638 Owl shift summary] | ||
+ | * [https://logbooks.jlab.org/entry/4133777 Early Riser shift summary] | ||
+ | |||
+ | === Shift Reports Saturday=== | ||
+ | * [https://logbooks.jlab.org/entry/4133952 Day shift summary] | ||
+ | * [https://logbooks.jlab.org/entry/4134082 Swing shift summary] | ||
+ | * [https://logbooks.jlab.org/entry/4134308 Owl shift summary] | ||
+ | * [https://logbooks.jlab.org/entry/4134418 Early Riser shift summary] | ||
+ | |||
+ | === Shift Reports Sunday=== | ||
+ | * [https://logbooks.jlab.org/entry/4134593 Day shift summary] | ||
+ | * [https://logbooks.jlab.org/entry/4134777 Swing shift summary] | ||
+ | * [https://logbooks.jlab.org/entry/4134888 Owl shift summary] | ||
+ | * [https://logbooks.jlab.org/entry/4134981 Early Riser shift summary] | ||
+ | |||
+ | === Reports === | ||
+ | * [https://logbooks.jlab.org/entry/4134037 Hall A fire alarm on Sat.] | ||
+ | * [https://logbooks.jlab.org/entry/4133226 Temperature rise of target compressor cooling water] (Tim) | ||
+ | * [https://logbooks.jlab.org/entry/4133378 TAGH hot channels w/ no beam] | ||
+ | * [https://logbooks.jlab.org/entry/4133568 Harp scan on Friday] | ||
+ | * [https://logbooks.jlab.org/entry/4133666 Noise in FDC2] (Lubomir) | ||
+ | * [https://logbooks.jlab.org/entry/4133998 FCAL11 crate problems] (Sergey) | ||
+ | * [https://logbooks.jlab.org/entry/4134665 For production runs please try to start the DAQ with beam on] (Naomi) | ||
+ | * [https://logbooks.jlab.org/entry/4135073 Tagger cycled] (Alexandre) | ||
+ | * Statistics balance | ||
+ | **PARA 0/90: 21.4% | ||
+ | **PERP 0/90: 20.7% | ||
+ | **PARA 45/135: 20.7% | ||
+ | **PERP 45/135: 20.4% | ||
+ | **AMO : 16.8% | ||
+ | |||
+ | === Issues === | ||
+ | * BCAL (Mark) | ||
+ | ** [https://logbooks.jlab.org/entry/4133137 ISEG channel measured voltage has ripple] | ||
+ | ** [https://logbooks.jlab.org/entry/4133949 ISEG replacement module has bad channel] --> talk to Chris. | ||
+ | ** [https://logbooks.jlab.org/entry/4133950 BCAL has been at wrong temperature since Thursday] | ||
+ | Pending: | ||
+ | * [https://logbooks.jlab.org/entry/4117764 Start Counter (Beni)] - We do not understand why there is a mismatch in the software between start counter and tracking. | ||
+ | * BCM calibration. Alexandre recommends that we request a recalibration of AD00C BCM. (~2h) --> Got the green light from PD and RCs. Will be done this morning. | ||
+ | |||
+ | === Plans === | ||
+ | * BCM calibration from 10:00am (takes ~2h). Cannot access the hall during this task. | ||
+ | ** Good time for BCAL cosmic runs? | ||
+ | ** Do Harp scan after this downtime. | ||
+ | * Install CCAL whenever there is an extended accelerator downtime | ||
+ | ** Restricted Access is needed to be able to use the ramp <-done | ||
+ | ** Cabling | ||
+ | ** Survey is needed | ||
+ | * Production (300 nA, 2h runs) with cycle: | ||
+ | **2 runs PARA (0/90) | ||
+ | **2 runs PERP (0/90) | ||
+ | **2 runs PARA (45/135) | ||
+ | **2 runs PERP (45/135) | ||
+ | **1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI) | ||
= Friday February 17 = | = Friday February 17 = |
Latest revision as of 09:40, 22 February 2023
Zoom connect Meeting ID: 160 199 0060 / Passcode 8394
Hall D counting room white board
Contents
Wednesday February 22
Past 24 hours
- Production runs. Several cosmic runs were taken during downtimes.
Shift Reports
Reports
- Follow-up Re: IBC0L02 calibration to FC2 (Alexandre)
- Hall D Target compressor cooling water (Tim)
- ISEG modules swapped (Mark)
- TAGM wave forms (Beni)
- MPOD installed on CCAL test setup (Sasha)
- brief grafana error (Simon)
- Tagger NMR (Scot)
- FDC CDC gas pressure alarm PT501
- Statistics balance
- PARA 0/90: 21.0%
- PERP 0/90: 20.5%
- PARA 45/135: 21.4%
- PERP 45/135: 20.6%
- AMO : 16.5%
Issues
Pending:
- Start Counter (Beni) - We do not understand why there is a mismatch in the software between start counter and tracking.
- TAGH hot channels w/ no beam
- Hovanes rebooted the crate but it didn't help.
- Sasha explains the problematic channel(s) are deteriorated and this is not an issue which can be easily fixed.
- Noise in FDC2 (Lubomir)
- FCAL11 crate problems (Sergey)
- Network port on the fan tray for FCAL11 crate is not working. When we have an expected long downtime, this tray should be replaced (Chris Stanislav).
Plans
- Install CCAL whenever there is an extended accelerator downtime
- Restricted Access is needed to be able to use the ramp <-done
- Cabling
- Survey is needed
- Production (300 nA, 2h runs) with cycle:
- 2 runs PARA (0/90)
- 2 runs PERP (0/90)
- 2 runs PARA (45/135)
- 2 runs PERP (45/135)
- 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)
Tuesday February 21
Past 24 hours
- BCM Calibration executed. MCC decided no recalibration was needed.
- Production runs resumed after beam came back.
Shift Reports
Reports
- Hall D NMR Meter - Installed (Scot)
- MCC stopped beam delivery after NMR IOC communication loss (just a monitor device) was detected.
- (In RC meeting) They say they are not expert in Hall equipment and they will stop the beam delivery when whatever crew chief does not know happens.
- BCM calibration
- MCC called shift crews to ask what the maximum calibration current should be.
- (In RC meeting) They say this is on us (Hall D), so we should prepare this value beforehand in the future BCM calibration work.
- Harp scan after BCM work
- Harp scan after the long midnight downtime
- BCAL ISEG modules swapped during a long downtime (Mark)
- Took BCAL cosmic run (R120783 and more) during the calibration work (and during midnight downtime).
- Early-riser shift leader felt unwell and Keigo (RC) took over. We need a volunteer for tomorrow morning shift.
- Statistics balance
- PARA 0/90: 21.0%
- PERP 0/90: 20.5%
- PARA 45/135: 21.4%
- PERP 45/135: 20.6%
- AMO : 16.5%
Issues
Pending:
- Start Counter (Beni) - We do not understand why there is a mismatch in the software between start counter and tracking.
- TAGH hot channels w/ no beam
- Noise in FDC2 (Lubomir)
- FCAL11 crate problems (Sergey)
- Temperature rise of target compressor cooling water (Tim)
Plans
- Install CCAL whenever there is an extended accelerator downtime
- Restricted Access is needed to be able to use the ramp <-done
- Cabling
- Survey is needed
- Production (300 nA, 2h runs) with cycle:
- 2 runs PARA (0/90)
- 2 runs PERP (0/90)
- 2 runs PARA (45/135)
- 2 runs PERP (45/135)
- 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)
Monday February 20
Past 72 hours
- Production runs. ABU = 35.5 h for the weekend. (12.7 h Friday, 13.8 h Saturday, 9.0 h Sunday)
Shift Reports Friday
Shift Reports Saturday
Shift Reports Sunday
Reports
- Hall A fire alarm on Sat.
- Temperature rise of target compressor cooling water (Tim)
- TAGH hot channels w/ no beam
- Harp scan on Friday
- Noise in FDC2 (Lubomir)
- FCAL11 crate problems (Sergey)
- For production runs please try to start the DAQ with beam on (Naomi)
- Tagger cycled (Alexandre)
- Statistics balance
- PARA 0/90: 21.4%
- PERP 0/90: 20.7%
- PARA 45/135: 20.7%
- PERP 45/135: 20.4%
- AMO : 16.8%
Issues
- BCAL (Mark)
Pending:
- Start Counter (Beni) - We do not understand why there is a mismatch in the software between start counter and tracking.
- BCM calibration. Alexandre recommends that we request a recalibration of AD00C BCM. (~2h) --> Got the green light from PD and RCs. Will be done this morning.
Plans
- BCM calibration from 10:00am (takes ~2h). Cannot access the hall during this task.
- Good time for BCAL cosmic runs?
- Do Harp scan after this downtime.
- Install CCAL whenever there is an extended accelerator downtime
- Restricted Access is needed to be able to use the ramp <-done
- Cabling
- Survey is needed
- Production (300 nA, 2h runs) with cycle:
- 2 runs PARA (0/90)
- 2 runs PERP (0/90)
- 2 runs PARA (45/135)
- 2 runs PERP (45/135)
- 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)
Friday February 17
Past 24 hours
- Mark D. replaced the bad BCAL HV board with a new one at 9:40am.
- No beam from 13:00 to 17:30 (0L40 cryo issue). Several people worked in the hall during this downtime.
- Production runs resumed after beam came back.
Shift Reports
Reports
- Please don't prestart very early (for CDC calibration) (Naomi)
- Broken TAGM scaler issue resolved (Hovanes)
- BCAL HV board changed [1] [2] (Mark)
- Several works done in the hall during day-shift downtime
- IOC for chiller issue --> Fixed by Josh, Scot, and Bobb.
- BCAL chiller alarm --> Fixed by Hovanes.
- DIRC FPGA communication errors, DAQ issues (not communicating with most of ROCs) --> Fixed by Sergey.
- Sasha and Vlad entered the hall for the calorimeter work.
- Higher occupancy in FDC -> Efficiency looks OK. (Lubomir)
- Statistics balance
- PARA 0/90: 20.8%
- PERP 0/90: 20.0%
- PARA 45/135: 21.1%
- PERP 45/135: 20.7%
- AMO : 17.3%
Issues
Pending:
- Start Counter (Beni) - We do not understand why there is a mismatch in the software between start counter and tracking.
- BCM calibration. Alexandre recommends that we request a recalibration of AD00C BCM. (~30 mins?)
Plans
- On Monday, Sasha and Chris are planning to work in the hall (?)
- Install CCAL whenever there is an extended accelerator downtime
- Restricted Access is needed to be able to use the ramp <-done
- Cabling
- Survey is needed
- Production (300 nA, 2h runs) with cycle:
- 2 runs PARA (0/90)
- 2 runs PERP (0/90)
- 2 runs PARA (45/135)
- 2 runs PERP (45/135)
- 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)
Thursday February 16
Past 24 hours
- Production runs with a stable beam.
- 2 BCAL HVs have been off since midnight due to a bad voltage board.
Shift Reports
Reports
- Rebooting NMR meter and its IOC (Hovanes)
- target LCW temperature alarm (Alexandre)
- Noise on some TPOL channels (Data should be good enough). (Michael Dugger, Beni)
- Statistics balance
- PARA 0/90: 20.9%
- PERP 0/90: 19.9%
- PARA 45/135: 20.8%
- PERP 45/135: 20.4%
- AMO : 18.1%
Issues
- A bad voltage board in the BCAL. Needs to be changed. (Mark)
- HallD Run #120726: LED ADC reference SiPM time anomaly
Pending:
- TAGM discriminator TRG scaler gone wild
- Start Counter (Beni) - We do not understand why there is a mismatch in the software between start counter and tracking.
- BCM calibration. Alexandre recommends that we request a recalibration of AD00C BCM.
Plans
- A bad BCAL HV board should be changed. Chris Stanislav is out today, and Mark D. is trying to find someone to change the BCAL board.
- Install CCAL whenever there is an extended accelerator downtime
- Restricted Access is needed to be able to use the ramp <-done
- Cabling
- Survey is needed
- Production (300 nA, 2h runs) with cycle:
- 2 runs PARA (0/90)
- 2 runs PERP (0/90)
- 2 runs PARA (45/135)
- 2 runs PERP (45/135)
- 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)