+ | ==Wednesday March 15== | ||
+ | ===Past 24 hours=== | ||
+ | *production continues, start of the day shift:injector orbit optimization issue, trippy beam, beam lost: BLM trips, TAGH HV alarms, production smooth over the night. No beam at this time take for wednesday. | ||
+ | *ABU=13.58 hr(Wednesday morning upto 8 am) | ||
+ | ===Shift Reports=== | ||
+ | *[https://logbooks.jlab.org/entry/4149422 Day Shift Summary] | ||
+ | *[https://logbooks.jlab.org/entry/4149715 Swing Shift Summary] | ||
+ | *[https://logbooks.jlab.org/entry/4149821 Owl Shift Summary] | ||
+ | *[https://logbooks.jlab.org/entry/4149895 Early Riser Shift Summary] | ||
+ | ===Reports=== | ||
+ | *[https://logbooks.jlab.org/entry/4149680 TAGH HV Sasha Powercycled the crate] | ||
+ | *[https://logbooks.jlab.org/entry/4149750 Harp Scan Results comparision] | ||
+ | *[https://logbooks.jlab.org/entry/4149855 AC orbit lock status vs AC Y,X, Beam Current] | ||
+ | *[https://logbooks.jlab.org/entry/4149857 PS/PSC conic scalar rate: run period so far] | ||
+ | ===Issues=== | ||
+ | *[https://logbooks.jlab.org/entry/4149628 TAGH HV alarm issue(resolved)] | ||
+ | *[https://logbooks.jlab.org/entry/4149908 (52,44)] (FCAL bases) | ||
+ | ===Plans=== | ||
+ | *Tagger Hall Access (March 15) by Hovanes(After the Hall is surveyed and gets into controlled access) | ||
+ | *High current run(900 nA)[High intensity scan:Final round] with modified trigger thresh-holds[Wednesday swing/Thursday day Shift][Justin, Sasha, Lubomir, Naomi][Access not required] | ||
+ | *Straight-track run ~50nA (Magnetic field off: drift chamber)[March 19th sunday swing][Justin, Sasha, Lubomir,Naomi][Access not required][https://logbooks.jlab.org/entry/4151011 Instructions for Straight-track run] | ||
+ | ==Plans on Accelerator Side== | ||
+ | *Beam Test studies/BPM test(wednesday. 3 Beam studies planned so far. One is at Hall A while 2 for cebaf center and could take from 3 pm to late swing shift. | ||
+ | ===Regular Production Cycle=== | ||
+ | *Production (300 nA, 2h runs) with cycle: | ||
+ | **2 runs PARA (0/90) | ||
+ | **2 runs PERP (0/90) | ||
+ | **2 runs PARA (45/135) | ||
+ | **2 runs PERP (45/135) | ||
+ | **1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI) | ||
=Tuesday March 14= | =Tuesday March 14= | ||
Line 18: | Line 48: | ||
*A very short ~11 min run as per Sasha's request in a raw mode | *A very short ~11 min run as per Sasha's request in a raw mode | ||
*Production resumed | *Production resumed | ||
− | *ABU= | + | *ABU=10.82 hr (till 12:00 am) |
− | + | ||
===Shift Reports=== | ===Shift Reports=== | ||
*[https://logbooks.jlab.org/entry/4148845 Day Shift Summary] | *[https://logbooks.jlab.org/entry/4148845 Day Shift Summary] | ||
*[https://logbooks.jlab.org/entry/4149048 Swing Shift Summary] | *[https://logbooks.jlab.org/entry/4149048 Swing Shift Summary] | ||
− | *[https://logbooks.jlab.org/entry/ | + | *[https://logbooks.jlab.org/entry/4149821 Owl Shift Summary] |
− | *[Early Riser Shift Summary] | + | *[https://logbooks.jlab.org/entry/4149235 Early Riser Shift Summary] |
− | + | ||
===Reports=== | ===Reports=== | ||
*[https://logbooks.jlab.org/entry/4148807 curious HallD beam energy behavior](Alexandre D.) | *[https://logbooks.jlab.org/entry/4148807 curious HallD beam energy behavior](Alexandre D.) | ||
Line 31: | Line 59: | ||
===Issues=== | ===Issues=== | ||
*[https://logbooks.jlab.org/entry/4148723 beam stopper mismatched](resolved: swapped: network communication switch)(Beam lost about 11 hours) | *[https://logbooks.jlab.org/entry/4148723 beam stopper mismatched](resolved: swapped: network communication switch)(Beam lost about 11 hours) | ||
− | *[https://logbooks.jlab.org/entry/4148939 PSS Drop injector/North Linac/Hall D/Tagger](MCC) | + | *[https://logbooks.jlab.org/entry/4148939 PSS Drop injector/North Linac/Hall D/Tagger](MCC) |
− | *[https://logbooks.jlab.org/entry/4149168 AC X,Y position vs AC orbit lock status] | + | *[https://logbooks.jlab.org/entry/4149168 AC X,Y position vs AC orbit lock status] |
− | *[https://logbooks.jlab.org/entry/4149165 (16,19)][https://logbooks.jlab.org/entry/4149229 | + | *[https://logbooks.jlab.org/entry/4149165 (16,19)][https://logbooks.jlab.org/entry/4149229 (11,14)(42,5)] (FCAL bases locked) |
==Plans== | ==Plans== | ||
*Hovanes will seek Tagger hall access on wednesday. Need Radcon support. It has already been set up for morning. | *Hovanes will seek Tagger hall access on wednesday. Need Radcon support. It has already been set up for morning. | ||
Line 39: | Line 67: | ||
*When HallC is down, more data for TAC run?(next week) [Sasha] | *When HallC is down, more data for TAC run?(next week) [Sasha] | ||
*High current run(900 nA) with modified trigger thresh-holds[Wednesday Swing Shift][Justin, Sasha,Lubomir][Access not rquired] | *High current run(900 nA) with modified trigger thresh-holds[Wednesday Swing Shift][Justin, Sasha,Lubomir][Access not rquired] | ||
− | *Straight-track run ~ | + | *Straight-track run ~50nA (Magnetic field off: drift chamber)[March 19th sunday swing/owl shift][Justin, Sasha, Lubomir][Access not required] |
==Plans on Accelerator Side== | ==Plans on Accelerator Side== | ||
*Beam Test studies/BPM test (wednesday) | *Beam Test studies/BPM test (wednesday) | ||
Line 50: | Line 78: | ||
**1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI) | **1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI) | ||
− | + | =Monday March 13(Past 72 hours)= | |
− | + | ||
− | = Monday March 13(Past 72 hours) = | + | |
=== Friday Through Monday March (10-13) === | === Friday Through Monday March (10-13) === |
Latest revision as of 14:43, 17 March 2023
Zoom Connect Meeting ID: 160 199 0060 / Passcode 8394
Hall D counting room white board
Contents
Wednesday March 15
Past 24 hours
- production continues, start of the day shift:injector orbit optimization issue, trippy beam, beam lost: BLM trips, TAGH HV alarms, production smooth over the night. No beam at this time take for wednesday.
- ABU=13.58 hr(Wednesday morning upto 8 am)
Shift Reports
Reports
- TAGH HV Sasha Powercycled the crate
- Harp Scan Results comparision
- AC orbit lock status vs AC Y,X, Beam Current
- PS/PSC conic scalar rate: run period so far
Issues
- TAGH HV alarm issue(resolved)
- (52,44) (FCAL bases)
Plans
- Tagger Hall Access (March 15) by Hovanes(After the Hall is surveyed and gets into controlled access)
- High current run(900 nA)[High intensity scan:Final round] with modified trigger thresh-holds[Wednesday swing/Thursday day Shift][Justin, Sasha, Lubomir, Naomi][Access not required]
- Straight-track run ~50nA (Magnetic field off: drift chamber)[March 19th sunday swing][Justin, Sasha, Lubomir,Naomi][Access not required]Instructions for Straight-track run
Plans on Accelerator Side
- Beam Test studies/BPM test(wednesday. 3 Beam studies planned so far. One is at Hall A while 2 for cebaf center and could take from 3 pm to late swing shift.
Regular Production Cycle
- Production (300 nA, 2h runs) with cycle:
- 2 runs PARA (0/90)
- 2 runs PERP (0/90)
- 2 runs PARA (45/135)
- 2 runs PERP (45/135)
- 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)
Tuesday March 14
Past 24 Hours
- Halld Beam Stopper mismatch, hall is in power permit from morning ~6:50 am.
- Back to beam permit at ~3:50 pm.
- Harp Scan(>10 hours without beam and several works on accelerator)
- A very short ~11 min run as per Sasha's request in a raw mode
- Production resumed
- ABU=10.82 hr (till 12:00 am)
Shift Reports
Reports
- curious HallD beam energy behavior(Alexandre D.)
- harp scan extrapolation[1] [2]
Issues
- beam stopper mismatched(resolved: swapped: network communication switch)(Beam lost about 11 hours)
- PSS Drop injector/North Linac/Hall D/Tagger(MCC)
- AC X,Y position vs AC orbit lock status
- (16,19)(11,14)(42,5) (FCAL bases locked)
Plans
- Hovanes will seek Tagger hall access on wednesday. Need Radcon support. It has already been set up for morning.
- Sasha will be taking 5-10 min of data on raw mode once beam comes back(done)
- When HallC is down, more data for TAC run?(next week) [Sasha]
- High current run(900 nA) with modified trigger thresh-holds[Wednesday Swing Shift][Justin, Sasha,Lubomir][Access not rquired]
- Straight-track run ~50nA (Magnetic field off: drift chamber)[March 19th sunday swing/owl shift][Justin, Sasha, Lubomir][Access not required]
Plans on Accelerator Side
- Beam Test studies/BPM test (wednesday)
Regular Production Cycle
- Production (300 nA, 2h runs) with cycle:
- 2 runs PARA (0/90)
- 2 runs PERP (0/90)
- 2 runs PARA (45/135)
- 2 runs PERP (45/135)
- 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)
Monday March 13(Past 72 hours)
Friday Through Monday March (10-13)
(Friday)
- Production whenever beam available on Friday mid-day shift, then at 2:51 pm beam down due accelerator issue. ETA was 7-8 pm swing. Beam restored around 9 pm.
- Harp Scan[Friday swing]
- Opportunistic Access(Friday): Karthik, Zisis, Stejphan: (EIC) mini BCAL prototype test
- Hovanes:TPOL crate powercycled: alarm exists but self disappears quickly after increase of delay by 60s
- ABU=10.37 hr (Upto Friday 8 am)
(Saturday)
- Production continues, Issue on 1LO4 HV drop(NL) : cost ~2 hours of downtime, trippy beam
- Beam back: day shift crew continued production followed by swing(trip rate is still high), towards the mid-swing shift: trip rate low,better beam delivery.
- ABU=8.63 hr(Saturday 8 am)
(Sunday)
- Production continues throughout the owl shift, Early riser and mid-day shift. Started TAC run study by Sasha at about 2 pm. Expected completion: Late swing shift.Before the Vacuum pump alarm(11:30am-1:15 pm), beam was good with less trips. Finished TAC run. Beam restored. But accelerator had problems 1L05,07 NL system at the begining of owl shift. Beam restored at 12:13 pm and production also resumed.
- ABU=14.73 hr (Upto Sunday 8 am), far better
(Monday: upto 8 am)
- Production running from midnight,
- ABU=8.03 hr (Monday upto 4 am)
Shift Reports
- Day Shift March 10Day Shift March 11Day Shift March 12
- Swing Shift March 10Swing Shift March 11Swing Shift March 12
- Owl Shift March 10/11 Owl Shift March 11/12Owl Shift March 12/13
- Early Riser Shift March 11 Early Riser Shift March 12Early Riser Shift March 13
- Total triggers since friday day shift(March 10):8.2b
Reports
- Harp Scan
- PS FADC Scalar Readouts(Left/Right arm) dead channels(Lydia)[3](Left arm) [4](Right Arm) [5]dead and non dead channels
- Switch COBREM Template to new TAGM configuration(Hovanes)
- TAC run (Sasha)bleedthrough current during TAC run
Issues
- TPOL alarms after Powercycle of crate, alarm still exists but less frequent
- FDC HV Channel 2 C1 trips every couple of minutes (Amy)
- Lowered the FDC HV channel 2 C1 2150V to 2125V (Lubomir)
- FCAL base lock up (41:48) (11,49), (28,50) (41,39)(18,32) manual reset(Amy)[-1,4)(14,13) Hovanes)]
- Vacuum pump alarm[Vacuum pump alarm areas[6](Mike) plot of alarmed variableGoni Vacuum pump alarms (Keith)
- Target AlarmsMike Target AlarmsMike
- COBREM spectrum after Vacuum pump alarmCOBREM corrected[Olga/Hovanes]
- begining of owl shift had DAQ issue: Powercycled rocDIRC and soft reboot of IOC by Hovanes (on call Justin).Issue was solved and DAQ started.
Plans
- bleed through measurement sunday, as of 2 pm it is going forward and Sasha and shift crew are working on it. TAC run started. Expected completion: late swing shift, then resumes production.
Regular Production Cycle
- Production (300 nA, 2h runs) with cycle:
- 2 runs PARA (0/90)
- 2 runs PERP (0/90)
- 2 runs PARA (45/135)
- 2 runs PERP (45/135)
- 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)
Friday March 10
Past 24 hours
- Production continued
- Four hall operation until ~11 pm, then HallC down until the morning. A,B and D operational overnight.
- Beam was trippy during the day but got better over the swing shift through owl shift.
- ABU=10.37 hr(midnight), ~4bn triggers
Shift Reports
Reports
- Main Trigger Scalar frozen restarted (Alexandre D.)
- FCAL Base (22,55) lock up and reset Alan G.
- FCAL Base Lock up alarms:SashaFCAL Base lock up (42,7) and (45,13)(25,27), (-5,-3): Rebecca B.
- Off node in addition to base lock: required to reset [Jesse H.]
- Strip charts for DAQ status, current, PS/PSC rates etc..
Issues
- TPOL alarms continued
- DAQ live time 0%, restart did not solve, Surgey had to reset gluon01 crate: solved
- DAQ issue early riser this morning: ROCFCAL error,DAQ reset (solved)
- Active collimator bias voltage:[7] alarms to EPICS (Lubomir and Hovanes to communicate for TPOL card, one is in use. We should have one more somewhere)
Plans
- Opportunistic Access by Zisis/Karthik for mini BCAL prototype
- TAC run (next week? or 3/10: HallC down for the night and probably for entire morning)
- Energy measurement at HallC
- Bleedthrough measurement at HallD
- if HallC run low current or down for 2 hours at least, Sasha will do some work on TAC run.
- 3/10 HallC will have some down time at least some part of morning confirmed from HallC RC(Joerg), can we do some tests during HallC downtime?
- Sasha Positive for the morning(3/10) based on HallC condition till that time.
Regular Production Cycle
- Production (300 nA, 2h runs) with cycle:
- 2 runs PARA (0/90)
- 2 runs PERP (0/90)
- 2 runs PARA (45/135)
- 2 runs PERP (45/135)
- 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)
Thursday March 9
Past 24 hours
- Work on Injector(early day shift): completed, beam restored.
- HI test(900nA) Pb and Mo foils, HI study completed at the end of day shift and nominal production conditions restored including AC gain 10^-8
- Production resumed at swing shift with AMO radiator configuration
- Rate Scan study by Sasha: Swing shift, raw and production mode at different currents:300nA, 350nA and 400nA
- Production resumed with 0/90 PARA after Sasha's rate scan completion
- Beam off due to 1L09 tripping high voltage(~1.5hr)
- Beam (trippy) early owl shift, then better beam, then beam current was fluctuating and was under 300 nA
- ABU=11.28 hr(till 8 am 3/9), ~2 bn production triggers till 5 am 3/9, smooth running over the night
Shift Reports
Reports
- High intensity test with Pb and Mo foils(Justin)
- [8] [9] Pb and Molybdenum foil inserted](Lubomir)
- Doubled the thickness of the Molybdenum (Lubomir)
- [10] [11] CDC currents with W and W+Pb foils (Naomi)
- CDC currents with W and Mo foils (Naomi)
- CDC AI on 16:25 3/8 swing (Naomi)
- Beam halo alarms
- Missing data on channel 23 TPOL(Roman)
- FCAL Base Lockup
- Beam Current over the night (Jesse)
- [12][13]TPOL occupancies not flat before reset of rootspy](Yannik)
Issues
- TPOL alarms
- DAQ issue this morning: live time dropped to 0%, restarting solved the issue
Plans
- TAC run whenever opportunity comes( HallC run at small current or down)
Regular Production Cycle
- Production (300 nA, 2h runs) with cycle:
- 2 runs PARA (0/90)
- 2 runs PERP (0/90)
- 2 runs PARA (45/135)
- 2 runs PERP (45/135)
- 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)