Difference between revisions of "June 18, 2024 KLONG CPS Design Meeting"
From GlueXWiki
(2 intermediate revisions by 2 users not shown) | |||
Line 15: | Line 15: | ||
*** Noise low (less than 70 db in hall, 85db in ramp near compressor) | *** Noise low (less than 70 db in hall, 85db in ramp near compressor) | ||
*** No visible dust | *** No visible dust | ||
+ | * [[media:ebed_06_18_2024.pdf | Carbon ring upstream of CPS]] | ||
* Power supply status - On order, due March 2025 | * Power supply status - On order, due March 2025 | ||
* Met with Survey and Alignment group and agreed on preliminary plan for alignment - will meet again as details develop | * Met with Survey and Alignment group and agreed on preliminary plan for alignment - will meet again as details develop | ||
Line 29: | Line 30: | ||
== Minutes == | == Minutes == | ||
+ | * Reviewed minutes from last meeting | ||
+ | * Pavel has run the radiation and energy absorption (Fluka) for the latest absorber and shielding configuration | ||
+ | ** Hovanes put Pavels finer mesh models into csv files | ||
+ | ** Keith changed 3D model geometry to match Pavel's latest | ||
+ | *** Copper substituted for CuW in and around magnet | ||
+ | ** Radiation levels at magnet coils are 4e4 gray for 10000 hrs running | ||
+ | *** No need for expensive epoxy ($5K per gallon) | ||
+ | *** CTD-101K resin can be used - good for 4e6 gray minimum | ||
+ | *** Need to check on LCW quality of existing dump copper cooling skid for magnet compatibility (Tim) | ||
+ | ** Pavel's new geometry has tapered steel upstream of absorber in X and Y - needs | ||
+ | ** Also taper in Y in Cu/W in magnet area - adjusted to use the exit size all the way through | ||
+ | ** New files with fine granularity in absorber high energy absorption areas are available - Hovanes converted to usable files for ANSYS | ||
+ | ** Tim will run new ANSYS models for the complete assembly | ||
+ | ** Tim learning FLUENT to verify cooling assumptions | ||
+ | ** There needs to be a collimator upstream of radiator | ||
+ | *** 1cm diameter hole | ||
+ | *** 15 cm deep in Z | ||
+ | *** OD of ? cm | ||
+ | *** About 10W absorption - no active cooling required | ||
+ | *** 80% W, 20% Cu | ||
+ | * Looking at 3D model | ||
+ | ** Core assembly coming together | ||
+ | *** Met with Alignment group Thursday to discus alignment/fiducialization plan | ||
+ | *** Looked at "Noah's Arc" stacking of steel - need features for stacking lead and heavy concrete | ||
+ | *** Copper absorber vacuum brazing test piece has been machined - will get tubing ready to braze in coming week | ||
+ | ** Air casters for moving - AeroGo demonstration proved to be successful | ||
+ | *** 5400 lbs moved with 25 lbs of force | ||
+ | * Discussion on FSD device to shut down beam if mis-steered - Hovanes has ideas and Pavel will look at feasability considering background | ||
+ | * Lead brick painting awarded - 17% complete | ||
+ | * Magnet Power Supply on schedule to be delivered March 2025 | ||
+ | * Magnet DeGauss test still scheduled for summer - Tim will check on any progress | ||
+ | * Tim still writing and analyzing copper and tungsten thermal cyling data for ERR reply to Patrizia - hopefully a draft next week | ||
+ | * Need to link engineering documentation to the KLONG CPS wiki when available - only final documents |
Latest revision as of 13:01, 26 June 2024
Meeting Time and Place
Tuesday, June 18, 2024, 1:00pm Hall D Counting House
- Invited - Hovanes Egiyan, Stephanie Worthington, Keith Harding, Pavel Degtiarenko, Tim Whitlatch, Eugene Chudakov, Josh Ballard
Agenda
- Review minutes from last meeting https://halldweb.jlab.org/wiki/index.php/June_04,_2024_KLONG_CPS_Design_Meeting
- Review new basic 3D model
- Core Section update
- New radiation levels? Pavel
- Copper replaced CuW inside and adjacent to magnet coils
- Layout of magnet and components (Stephanie/Keith)
- Demo of AeroGo system successful
- Noise low (less than 70 db in hall, 85db in ramp near compressor)
- No visible dust
- Carbon ring upstream of CPS
- Power supply status - On order, due March 2025
- Met with Survey and Alignment group and agreed on preliminary plan for alignment - will meet again as details develop
- Magnet update (Josh/Stephanie)
- Radiation levels at coils 2.E+4 Gy for a 10000 hour run
- Plan on using copper dump skid to cool magnet - is it adequate LCW?
- Copper cooling update -
- Status of brazing sample test media:CPS Absorber cooling test sample.pdf
- Lead brick painting is 10% done and all due back in September
- DeGauss test summer 2024
- June - items due from ERR
- Thermal cycling of tungsten and copper write up - in work - justifying annealed copper (Tim)
- Working on ANSYS plastic analysis and FLUENT models
Minutes
- Reviewed minutes from last meeting
- Pavel has run the radiation and energy absorption (Fluka) for the latest absorber and shielding configuration
- Hovanes put Pavels finer mesh models into csv files
- Keith changed 3D model geometry to match Pavel's latest
- Copper substituted for CuW in and around magnet
- Radiation levels at magnet coils are 4e4 gray for 10000 hrs running
- No need for expensive epoxy ($5K per gallon)
- CTD-101K resin can be used - good for 4e6 gray minimum
- Need to check on LCW quality of existing dump copper cooling skid for magnet compatibility (Tim)
- Pavel's new geometry has tapered steel upstream of absorber in X and Y - needs
- Also taper in Y in Cu/W in magnet area - adjusted to use the exit size all the way through
- New files with fine granularity in absorber high energy absorption areas are available - Hovanes converted to usable files for ANSYS
- Tim will run new ANSYS models for the complete assembly
- Tim learning FLUENT to verify cooling assumptions
- There needs to be a collimator upstream of radiator
- 1cm diameter hole
- 15 cm deep in Z
- OD of ? cm
- About 10W absorption - no active cooling required
- 80% W, 20% Cu
- Looking at 3D model
- Core assembly coming together
- Met with Alignment group Thursday to discus alignment/fiducialization plan
- Looked at "Noah's Arc" stacking of steel - need features for stacking lead and heavy concrete
- Copper absorber vacuum brazing test piece has been machined - will get tubing ready to braze in coming week
- Air casters for moving - AeroGo demonstration proved to be successful
- 5400 lbs moved with 25 lbs of force
- Core assembly coming together
- Discussion on FSD device to shut down beam if mis-steered - Hovanes has ideas and Pavel will look at feasability considering background
- Lead brick painting awarded - 17% complete
- Magnet Power Supply on schedule to be delivered March 2025
- Magnet DeGauss test still scheduled for summer - Tim will check on any progress
- Tim still writing and analyzing copper and tungsten thermal cyling data for ERR reply to Patrizia - hopefully a draft next week
- Need to link engineering documentation to the KLONG CPS wiki when available - only final documents