Line 7: | Line 7: | ||
:: - ECAL & FCAL ( & BCAL trigger), small energy threshold on the total energy (TBD) | :: - ECAL & FCAL ( & BCAL trigger), small energy threshold on the total energy (TBD) | ||
:: - run duration (TBD) | :: - run duration (TBD) | ||
+ | '''Initial ECAL gain calibration using Compton scattering events''' | ||
+ | |||
+ | '''Adjust HV, take more Compton scattering data''' | ||
+ | :: - several data sets will be needed to properly adjust HVs |
Latest revision as of 09:23, 6 September 2024
Initial ECAL gain calibration using Compton scattering events
- run at small small photon flux; use low-energy TAGH counters to constrain the total energy
- Run conditions:
- - amorphous radiator 10-4 R.L., 100 nA beam current
- - ECAL & FCAL ( & BCAL trigger), small energy threshold on the total energy (TBD)
- - run duration (TBD)
Initial ECAL gain calibration using Compton scattering events
Adjust HV, take more Compton scattering data
- - several data sets will be needed to properly adjust HVs