Difference between revisions of "Coil Test Weekly Meeting 7-Jan-2010"
From GlueXWiki
m |
m |
||
(3 intermediate revisions by the same user not shown) | |||
Line 9: | Line 9: | ||
'''Agenda''' | '''Agenda''' | ||
− | + | (note...Mark W has to leave early so I arranged the schedule appropriately) | |
+ | |||
+ | * Status of PLC programming - Mark W | ||
+ | * A-B EWEB module for web access ([http://www.jlab.org/~wolin/sample.html example page])- Elliott | ||
+ | * Power narrative to Mark W - George | ||
* Finalizing P&I diagram - George, Elliott | * Finalizing P&I diagram - George, Elliott | ||
+ | * ControlNet vs Ethernet/IP and fiber-optic communications - Elliott | ||
+ | * Alarm system and paging - Elliott | ||
+ | * What controls equipment still hasn't arrived - Scot | ||
+ | * FastTrack schedule status - George, Chuck | ||
+ | * Status of controls drawings and wiring lists - Scot | ||
* Coil 1 cryostat testing status - George | * Coil 1 cryostat testing status - George | ||
* Construction/installation sequence drawings - George | * Construction/installation sequence drawings - George | ||
− | |||
− | |||
− | |||
* Final decision on power supply dump resistor - Mark S | * Final decision on power supply dump resistor - Mark S | ||
* Arrange for electrical work in Test Lab - Tom | * Arrange for electrical work in Test Lab - Tom | ||
Line 22: | Line 28: | ||
* GN2 vent piping system - Tom | * GN2 vent piping system - Tom | ||
* QWeak area, bigger door in F117 - Tom | * QWeak area, bigger door in F117 - Tom | ||
− | |||
* Wiring progress in F117 - Scot | * Wiring progress in F117 - Scot | ||
* Locating computer in SRF control room - Elliott | * Locating computer in SRF control room - Elliott |
Latest revision as of 09:57, 7 January 2010
Solenoid Coil Test Weekly Meeting
Location and Time
- Thu 7-Jan-2010 9:45 am ARC 428
Agenda
(note...Mark W has to leave early so I arranged the schedule appropriately)
- Status of PLC programming - Mark W
- A-B EWEB module for web access (example page)- Elliott
- Power narrative to Mark W - George
- Finalizing P&I diagram - George, Elliott
- ControlNet vs Ethernet/IP and fiber-optic communications - Elliott
- Alarm system and paging - Elliott
- What controls equipment still hasn't arrived - Scot
- FastTrack schedule status - George, Chuck
- Status of controls drawings and wiring lists - Scot
- Coil 1 cryostat testing status - George
- Construction/installation sequence drawings - George
- Final decision on power supply dump resistor - Mark S
- Arrange for electrical work in Test Lab - Tom
- Arrange for telecom in Test Lab - Elliott
- Arrange for networking in Test Lab - Elliott
- GN2 vent piping system - Tom
- QWeak area, bigger door in F117 - Tom
- Wiring progress in F117 - Scot
- Locating computer in SRF control room - Elliott
- Backup computer - Elliott
- Status of interface to cryo can - George
- Status of pressure relief system design - George
- Status of ordering cryo can - George
- Coil 1 modification and testing - George
- Coil 2 cost and schedule - George
- Coil 3 statement of work, visit and IUCF contract - George, Tom
- Coil 4 controls wiring replacement - George
- Shipping rails and transportainer from IUCF - Chuck
- Safety reviews: when to start formal process - George, Elliott
- 5 G contours - George
- Coil Test Top To-Do items