'''Agenda''' | '''Agenda''' | ||
− | * DOE review 28-Sep - George, Elliott | + | * Installation status - all |
− | * Conduct of Operations - Josh | + | ** vapor-cooled lead connections? |
+ | ** what's left? | ||
+ | ** when do we give two weeks notice to Errol? | ||
+ | * Aftermath of DOE review 28-Sep - George, Elliott | ||
+ | ** can we detect turn-to-turn shorts? | ||
+ | *** pulse reflection in coil | ||
+ | *** subcoil voltages | ||
+ | *** Hall probe | ||
+ | * Conduct of Operations - Josh | ||
+ | ** status of creating documents | ||
* OSP documents and review - Elliott, George | * OSP documents and review - Elliott, George | ||
** what is left to do? | ** what is left to do? | ||
** when can/must we turn everything in? | ** when can/must we turn everything in? | ||
− | * | + | * Do we need He vessel LHe level in interlock system - George, Elliott |
− | + | ||
− | + | ||
* Test plan - Josh | * Test plan - Josh | ||
** addition of check valve and relief valve in lead flow system | ** addition of check valve and relief valve in lead flow system | ||
− | * Magnet power supply and interlock commissioning - Mark | + | * Magnet power supply and interlock commissioning - Mark S |
** latest status | ** latest status | ||
** adding a shunt to the interlock system | ** adding a shunt to the interlock system | ||
Line 38: | Line 45: | ||
** under what circumstances do we notify the guard shack? | ** under what circumstances do we notify the guard shack? | ||
* HMI and [http://halldeweb1.jlab.org/user/web/plc_urls.html EWEB programming] - Yi, Hovanes | * HMI and [http://halldeweb1.jlab.org/user/web/plc_urls.html EWEB programming] - Yi, Hovanes | ||
− | |||
** current status | ** current status | ||
** tutorial? | ** tutorial? |
Latest revision as of 16:56, 29 September 2010
Solenoid Coil Test Weekly Meeting
Location and Time
- Thu 30-Sep-2010 9:30am ARC 428
Agenda
- Installation status - all
- vapor-cooled lead connections?
- what's left?
- when do we give two weeks notice to Errol?
- Aftermath of DOE review 28-Sep - George, Elliott
- can we detect turn-to-turn shorts?
- pulse reflection in coil
- subcoil voltages
- Hall probe
- can we detect turn-to-turn shorts?
- Conduct of Operations - Josh
- status of creating documents
- OSP documents and review - Elliott, George
- what is left to do?
- when can/must we turn everything in?
- Do we need He vessel LHe level in interlock system - George, Elliott
- Test plan - Josh
- addition of check valve and relief valve in lead flow system
- Magnet power supply and interlock commissioning - Mark S
- latest status
- adding a shunt to the interlock system
- adding ground fault detection
- Controls racks - Scot
- strain gauge interlock
- UPS interlock
- anything else?
- PLC programming/testing status - Mark W
- UPS interlock
- guard shack
- what's left?
- backup PLC programmer, file locations, license key
- tutorial?
- EPICS <--> PLC communications - Hovanes
- PV list from Jonathan Creel and PLC tags
- connection to guard shack
- under what circumstances do we notify the guard shack?
- HMI and EWEB programming - Yi, Hovanes
- current status
- tutorial?
- Coil repair status - George
- Solenoid review 25-26 Oct
- Preparations for testing next coil - George, Elliott
- update P&I
- splices
- yoke location
- piping adaptors
- downstream yoke spacers
- controls racks rewiring